My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:38:58 AM
Creation date
9/30/2015 11:40:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
07/14/2009
Control Number
2009-192A
Agenda Item Number
8.I
Entity Name
DeAngelis Diamond Construction
Subject
Appendix C - Technical Specifications
IRC Parks Maintenance Complex
Area
5500 77 Street
Project Number
0701
Bid Number
2009043
Archived Roll/Disk#
4034
Supplemental fields
SmeadsoftID
6816
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2028
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L. Project Manual : As used in these Contract Dcluments includes the Bidding <br /> Requirements, Conditions of the Contract, d the Specifications . ' <br /> o M . Product: As used in these Contract Docu ent includes materials, systems, and <br /> equipment. <br /> N. Install : Operations at project site, in riding unloading, unpacking, assembly, <br /> erection, placing, anchoring, apply g, working to dimension, finishing, curing, <br /> protecting, cleaning and similar r uirements. <br /> O. Provide: Furnish and install , c plete and ready for intended use. <br /> P . Installer: Entity (firm or pe on) engaged to install work, by Contractor, <br /> subcontractor or sub- subc ntractor. Installers are required to be skilled experts in <br /> work that are engaged t nstall . <br /> Q. Overlapping/Conflic g Requirements: Most stringent requirements apply and will <br /> be enforced, unless ore detailed language written directly into Contract <br /> Documents clear] indicates that a less stringent requirement is acceptable. Where <br /> optional require ents are specified in a parallel manner, option is intended to be <br /> Contractor' s u ss otherwise indicated . <br /> R. Minimum quirements: Indicated requirements are for a specific minimum <br /> acceptable evel of quality/quantity, as recognized in the industry. <br /> S . The to " or equal" where used in the Project Manual shall in all cases mean an <br /> appro d equal as determined by the Architect. <br /> T. Co ract Documents : shall consist of all plans, specs, bid documents, addendum, <br /> a lication form, permits, and any other documents accumulated in the <br /> rformance of the construction of this project. <br /> U . Substantial Completion : The Date of Substantial Completion of the Work or <br /> designated portion thereof, is the Date certified by the Architect when construction <br /> is sufficiently complete, in accordance with the Contract Documents, so the Owner <br /> can occupy or utilize the Work or designated portion thereof, for the use for which <br /> it is intended , as expressed in the Contract Documents . <br /> V . The term "Engineer" shall mean the individual or individuals designated to <br /> represent the Owner or Architect in decisions affecting the work. <br /> * * *END OF SECTION* * * <br /> l - <br /> 01100-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.