My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:38:58 AM
Creation date
9/30/2015 11:40:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
07/14/2009
Control Number
2009-192A
Agenda Item Number
8.I
Entity Name
DeAngelis Diamond Construction
Subject
Appendix C - Technical Specifications
IRC Parks Maintenance Complex
Area
5500 77 Street
Project Number
0701
Bid Number
2009043
Archived Roll/Disk#
4034
Supplemental fields
SmeadsoftID
6816
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2028
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01200 - CONTRACTORS GENERAL NOTES <br /> 1 . 01 THE GENERAL CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE <br /> FOLLOWING : <br /> A. The Contractor shall warranty and guarantee all materials and workmanship for a <br /> period of ( 1 ) year from the date of completion. <br /> B . The Contractor shall secure Final Inspection and Acceptance, prior to the Release of <br /> Final Payment. <br /> C. The Contractor shall provide and maintain Workmans Compensation and Builders <br /> Risk Insurance with the limits required by law and as specified herein. <br /> D . All materials shall be new and of the quality specified. Substitutions will be allowed. <br /> but only with the Architects prior written approval. Verbal approvals to Contractors <br /> request for substitution are non-binding unless they are backed up with written <br /> documentation from the Architect. <br /> E. The Contractor shall coordinate all work with the manufacturer' s installation <br /> instructions and catalog cuts. <br /> F. The Contractor and Subcontractors shall perform all work in accordance with the best <br /> trade practices typical to the projects geographical location. <br /> G. Prior to final payment, the Contractor shall issue to the Owner, executed "Final <br /> Release of Lien" forms from all parties having lien rights against the Owner. <br /> H . Unless where noted otherwise, the Contractor shall provide all the labor, material , <br /> equipment, and incidentals, including all testing as required in the Specifications by an <br /> independent testing laboratory, necessary for a complete and operating project. <br /> I. The Contractor shall coordinate the work of all trades and/or Subcontractors and shall <br /> notify the Architect that all long-lead items for the project have been ordered as <br /> scheduled. <br /> 2 .01 EXAMINATION OF SITE <br /> Each Contractor shall carefully examine the site before submitting his bid. No allowance <br /> will be made him for a lack of full knowledge of all conditions at the site, except such <br /> underground conditions as are indeterminable before the commencement of the work. <br /> i' <br /> 01200-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.