My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:38:58 AM
Creation date
9/30/2015 11:40:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
07/14/2009
Control Number
2009-192A
Agenda Item Number
8.I
Entity Name
DeAngelis Diamond Construction
Subject
Appendix C - Technical Specifications
IRC Parks Maintenance Complex
Area
5500 77 Street
Project Number
0701
Bid Number
2009043
Archived Roll/Disk#
4034
Supplemental fields
SmeadsoftID
6816
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2028
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
When any room in the building is utilized as a storage space, shop, etc ., the parties making <br /> such use of those rooms shall be held responsible for any repairs, patching and cleaning <br /> that may arise from such use. The Owner, at any time during the construction of the <br /> project, may direct the Contractor to move materials stored in the building when it <br /> becomes necessary and this will be accomplished at no additional charge to the Owner. <br /> 8. 01 CLEANING <br /> The building must be kept free from all surplus material, dirt, and rubbish at all times, at <br /> the completion of the work all paint spots must be removed from the finished floors, walls, <br /> window and door frames and any glass where required. Finished glass scratched or etched <br /> due to cleaning shall be replaced by the Contractor. Limits of acceptance, of any scratched <br /> or etched glass, shall be made by the Owner. <br /> 9. 01 GLASS BREAKAGE <br /> The Contractor, before acceptance of the building, shall replace all glass that may have <br /> become broken, or damaged from any cause . <br /> 10 . 01 DOCUMENT EXISTING DAMAGE <br /> The Contractor, prior to mobilizing on the site, shall document any existing damage to <br /> items such as interior ceilings, driveways, interior and exterior walls, floors, floor <br /> ` coverings, curbs, sidewalks , glass breakage, sprinkler heads, etc. <br /> The Contractor will be responsible for repairing any materials, directly and indirectly <br /> damaged, as a result of his work on the job site. <br /> * * *END OF SECTION * * * <br /> 01200-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.