Laserfiche WebLink
2 . 11 TEMPORARY WATER <br /> The Contractor and his Subcontractors shall utilize a temporary water service as required <br /> for construction. The Contractor shall request, apply for, and pay the connection fee. The <br /> Contractor shall incur the meter cost and all monthly water usage costs, payable to the <br /> Utility Company having jurisdiction over the site. The Contractor shall utilized the water <br /> for construction and to sustain any specified landscaping. <br /> 2 . 12 JOB SITE PHONE AND FIELD OFFICE <br /> The Centracter will be required to engage the local telephone company to install and <br /> maintain a jobsite telephone and fax machine. In lieu of a jobsite telephone, a cell phone <br /> with voice mail capability for the job superintendent is acceptable. The Contractor shall <br /> provide the phone number to the Owner and the Architect. Unless stipulated otherwise, a <br /> job site Field Office is required for all projects. <br /> 2 . 13 TEMPORARY CHAIN LINK FENCING AND GATES <br /> The Contractor will be required to erect temporary galvanized chain link fencing, posts <br /> and gates to secure the construction and mobilization areas. Refer to the plans for <br /> suggested location of temporary fencing. The Contractor shall be responsible for <br /> reviewing the proposed location of the fencing with the Architect or Owner prior to <br /> erecting the fence. Minimum fence and gate height shall be 6 feet. Tops of galvanized <br /> fencing shall have turned down safety edges. Gates shall be locked at the end of the days <br /> construction . All locks shall be supplied by the Contractor. <br /> PART 3 - EXECUTION <br /> 3 . 01 GENERAL <br /> A. Comply with applicable requirements specified in Division 15 - Mechanical, and <br /> Division 16 - Electrical . <br /> B . Maintain and operate systems to assure continuous service and modify and extend <br /> systems as work progress requires. <br /> i <br /> 01500-3 <br />