My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-192A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-192A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:38:58 AM
Creation date
9/30/2015 11:40:21 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
07/14/2009
Control Number
2009-192A
Agenda Item Number
8.I
Entity Name
DeAngelis Diamond Construction
Subject
Appendix C - Technical Specifications
IRC Parks Maintenance Complex
Area
5500 77 Street
Project Number
0701
Bid Number
2009043
Archived Roll/Disk#
4034
Supplemental fields
SmeadsoftID
6816
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2028
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01720 - PROJECT RECORD DOCUMENTS <br /> PARTI - GENERAL <br /> 1 . 01 RELATED DOCUMENTS : <br /> The General Conditions of the Contract, including the General Requirements of Sections <br /> 01100 through 01820 shall be considered a part of this section. <br /> 1 .02 DESCRIPTION : <br /> A. Work Included: <br /> 1 . Maintain at the site for the Owner one record copy of. <br /> a. Drawings <br /> b . Specifications <br /> C , Addenda Issued by the Architect and Owner <br /> d. Change Orders and other modifications to the Contract <br /> e . Architect' s field orders or written instructions <br /> f. Approved Shop Drawings, Product Data and Samples <br /> g . Field test records and reports <br /> B . Related Requirements : <br /> 1 . Section 01300 : Submittals <br /> 1 .03 MAINTENANCE OF DOCUMENTS AND SAMPLES : <br /> A. Store documents and samples in field office apart from documents used for <br /> construction. <br /> B . File documents in a clean, dry, legible condition and in good order. Do not use <br /> record documents for construction purposes . <br /> C . Make documents and samples available at all times for inspection by Architect. <br /> 1 .04 RECORDING: <br /> A. Label each document "Project Record" in neat large printed letters . <br /> B . Provide one set of as-built mark-up plans to the Architect for electronic recording <br /> of the final built project. Marks shall be in red ball-point pen . (No marker pens). <br /> * * *END OF SECTION* * * <br /> 01720-1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.