Laserfiche WebLink
ATTACHMENT A <br /> PROJECT WORKPLAN <br /> WABASSO BEACH RESTORATION <br /> The PROJECT consists of the restoration and maintenance of approximately 7 . 1 miles of Atlantic shoreline between <br /> FDEP Reference Monuments R17 and R51 . In addition, the project includes emergency dune restoration for Wabasso <br /> Beach Park, Baytree, Marbrisa and Sea Grape trail . The PROJECT shall be conducted in accordance with the terms and <br /> conditions set forth under this Agreement, all applicable DEP permits and the eligible project task items established <br /> below. All data collection and processing, and the resulting product deliverables, shall comply with the standard technical <br /> specifications contained in the Department' s Regional Data Collection and Processing Plan and Geographic Information <br /> System Plan, unless otherwise specified in the approved Scope of Work for an eligible PROJECT item. These plans may <br /> be found at http://www.dep.state.fl.us/beaches/. Three (3) originals and one ( 1 ) electronic copy of all written reports <br /> developed under this Agreement shall be forwarded to the Department, unless otherwise specified. <br /> Task No : Eligible Project Item : <br /> 2 .0 Design and Permitting <br /> Professional services required for engineering and design , obtaining environmental permits and other <br /> authorizations and the preparation of plans and specifications. This item specifically excludes permit <br /> application fees or any other fees paid to the State of Florida. <br /> 2 . 1 Design and Permitting <br /> Coastal Technology Corporation , Inc. has been retained by Indian River County to conduct design and <br /> permitting activities associated with the Wabasso Beach Restoration Project. Tasks included as part of the <br /> design and permitting efforts include the following: Plan Formulation, Design, Permit Application, FDEP <br /> Permit Processing, USACE Permit Processing and NEPA Compliance and Project Administration and <br /> Coordination, engineering and geological analyses, controlled aerial photography, biological mapping and <br /> characterization, turtle abundance and QA/QC coordination of investigations. Total cost for the described <br /> tasks is $ 1 ,429, 548 . 00. The described activity costs are shared and conducted in concert with contract 071R 1 . <br /> 3.0 Construction <br /> 3.12007 Emergency Dune Restoration <br /> Work performed and costs incurred associated with the design, permitting and placement of fill material <br /> within the project area. Eligible costs may include mobilization, demobilization, construction observation or <br /> inspection services and beach fill . Construction shall be conducted in accordance with any and all permits <br /> issued by the Department. Total cost for the described services is $450,000 .00. The scope of work was <br /> approved on November 30, 2007. <br /> REMAINDER OF PAGE INTENTIONALLY LEFT BLANK <br /> DEP Agreement No. 071R2 , Attachment A. Page 1 of 1 <br />