Laserfiche WebLink
PROJECT OBJECTIVE(S) : There are 17 segments of the Indian River Lagoon basin that <br /> were identified on the Florida Department of Environmental Protection ( DEP) 1998 303(d ) <br /> list as impaired by nutrients , dissolved oxygen , or chlorophyll a and were scheduled for <br /> TMDL development by June 30 , 2003 . All of these segments fall within the FL DEP Indian <br /> River lagoon Group 5 Basin and , as a result, were scheduled for TMDL development by FL <br /> DEP in September 2004 . The segments in Indian River County that will be addressed by <br /> this project are named South Indian River WBID 5003C, IRL Segments 16-20. The Main <br /> Relief canal basin is segment # 19 . <br /> Due to the extensive network of canals that carry stormwater runoff in this region , Indian <br /> River County is in a unique position to capture and treat a significant portion of its total <br /> runoff. The Main Relief Canal conveys approximately half of the total runoff from the Indian <br /> River Farms Water Control District to the Indian River Lagoon . The proposed bar screen <br /> system will remove a significant quantity of nutrients and muck contributing solids from <br /> canal discharges. (TSS=411 ,000 Kg per year, TN =21 , 200 Kg per year, TP= 5, 200 Kg per <br /> year) . Removing these nutrient loads will move the County closer to meeting the TMDLs for <br /> this segment of the lagoon . <br /> Specific Project Obiectives : <br /> ( 1 ) To demonstrate that a combination of treatment technology ( i . e. self-cleaning bar <br /> screens and pumped sedimentation sumps) can be used to effeciently remove large <br /> amounts of floating and suspended material from an existing canal . <br /> (2) To demonstrate that a large stormwater pollution control device if maintained on a <br /> regular basis, can remove significant amounts of pollutants. <br /> (3) To demonstrate that if large quantities of aquatic plant material and algae are removed <br /> from the system , then large amounts of nutrients (nitrogen and phosphorus) associated with <br /> that plant material and algae are also removed . <br /> PROJECT DESCRIPTION : The Indian River Farms Water Control District ( IRFWCD) in <br /> Indian River County, Florida is an area over 53,000 acres that is drained by an extensive <br /> network of man-made canals . The IRFWCD discharges into the Indian River Lagoon , an <br /> Estuary of National Significance and a St. Johns River Water Management District <br /> (SJRWMD) Surface Water Improvement and Management (SWIM) program priority water <br /> body. In the East Indian River County Master Stormwater Management Plan (Master Plan) , <br /> a pollutant loading analysis showed that the three discharge canals of the IRFWCD convey <br /> large amounts of suspended solids, nutrients, and floating vegetative debris into the lagoon . <br /> Treatment alternatives were investigated in the Master Plan . It was recommended that <br /> sediment and floating debris collection systems be used to effect a significant reduction in <br /> suspended solids , nutrients, and floatables into the Lagoon . <br /> This project is for the construction of a large treatment device on the Main Relief canal that <br /> utilizes self-cleaning bar screens and pumped sedimentation basins to remove solids and <br /> floating debris from canal water. The proposed location of the treatment facility is west of <br /> US Highway 1 and the FEC railroad near the Vero Beach airport. The project will be <br /> constructed within the publically owned right-of-way of the Indian River Farms Water <br /> Control District. Fixed bar screens will be integrated with a traveling rake to remove large <br /> masses of vegetative debris such as hyacinths , water lettuce, duckweed and grasses and <br /> floating trash before the water enters the vortex unit. In addition , the pumped <br /> sedimentation basin will remove settleable suspended sediments. Based on water quality <br /> data for the Main Relief Canal and a design flow rate of 294 cfs , the following annual <br /> pollutant load reductions are estimated : <br /> DEP Agreement No. GO 182, Attachment A- 1 , Page 5 of 12 <br />