My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-099A
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-099A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2016 9:44:53 AM
Creation date
10/1/2015 3:27:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/07/2009
Control Number
2009-099A
Agenda Item Number
12.J.
Entity Name
Derrico Construction
Subject
Final Payment Application #4
FDOT Drainage
Area
US 1 from South Relief Canal to 9th St. (Oslo Road)
Project Number
UCP #2952
Supplemental fields
SmeadsoftID
10569
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT RECONCILIATION <br /> DERRICO CONSTRUCTION CORPORATION <br /> Post Office Box 361177 <br /> Melbourne, FL 32936-1177 <br /> Phone : ( 321 ) 254-2291 Date: Job No. : <br /> Fax : (321 ) 242 -7937 March 18 , 2009 08-383 <br /> Attention : <br /> Gordon Sparks <br /> RE : <br /> Oslo Road & US1 <br /> INDIAN RIVER COUNTY Contract Reconciliation <br /> 1801 27th Street <br /> Vero Beach 32960-3388 <br /> ltenr3t Quo iitt 1F it fleccri twit lltitP . . . PrtCe <br /> CREDITS <br /> 06h 80 LF 665+ 95. 91 - 20" Water Main Install 24" HDPE in Op 110 . 00 $8 ,800. 00 <br /> 7 1 Tons Fittings 12665.00 $ 1 , 665.00 <br /> 10d 80 LF Remove and Dispose of Pie 18" through 20" 27. 00 $2 160. 00 <br /> 15i 1 EA Install and Remove Line Stop an 20" WM , includes R 18 , 000.00 $ 18 ,000 .00 <br /> 18h 2 EA Install 20" NRS GV & B 900. 00 $ 1 , 800 . 00 <br /> 15h1 EA Install and Remove Line Stop on 18" FM , includes R 16 375. 00 $ 160375.00 <br /> 45b 1 EA Install 2" Air Release Valve and Manhole Structure oi 450.00 $450 .00 <br /> 1 LS IRCDUS Contingency Account 11 , 111 .95 $ 11 , 111 . 95 <br /> TOTAL CREDITS $60, 361 .95 <br /> ADDITIONAL ITEMS <br /> 06g 80 LF 661 + 13 . 61 - ( 18" Force Main) Install 20" HDPE in 0 70 . 00 $50600. 00 <br /> 06g 220 LF 661 + 13 . 61 - 18" Force Main Install 20" HDPE in Op 175. 00 $ 38,500 . 00 <br /> 86 4 EA 16" Restraints 650. 00 $2 , 600 .00 <br /> 291 112 LF 16" DR- 18 Pie 26.00 $2 ,912 .00 <br /> 12 3 CY Thrust Block 300. 00 $900.00 <br /> 1 LS Concrete for Thrust Block 410. 36 $410. 36 <br /> 14 d 1 EA 18" x 16" Saddle & Tap Valve 11300 . 00 $ 10300 . 00 <br /> 14 e 1 EA 16" x 16" Saddle & Tap Valve 1 , 300. 00 $ 1 , 300. 00 <br /> 61a 1 LS Well Point Each Tier Depth 11300.00 $ 1 , 300.00 <br /> 611b 30 EA Add Points for longer area 20.00 $600. 00 <br /> r48a416 EA DensityTest and Proctor 150 . 00 $20400 .00 <br /> 8 <br /> 12 EA Potholes 220 .00 $2 ,640 . 00 <br /> 20 TON : Saw Cut , Remove ad Dis ose of As halt 25. 00 $500 . 00 <br /> 20 TON , Install Asphaltic Cement-Type S-3 AC - 200 Tons or i 150 . 00 $3 , 000.00 <br /> 20 TON As halt Materials 316 . 67 $6 , 333. 40 <br /> 51a 4 SY Install Asphaltic Concrete - Flowable Fill 100 . 00 $400 .00 <br /> 1 LS Concrete Materials 406 . 61 $406 . 61 <br /> TOTAL ADDITIONAL ITEMS $71 , 102 . 37 <br /> TOTAL ADDITIONAL WORK - CREDITS $ 101740 . 42 <br /> Accep �' r <br /> SIGNED: . <br /> Signature John P. Robertson <br /> Title <br />
The URL can be used to link to this page
Your browser does not support the video tag.