My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-246
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 1:00:00 PM
Creation date
10/1/2015 12:27:58 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
08/12/2008
Control Number
2008-246
Agenda Item Number
12.J.5
Entity Name
Derrico Construction Corp.
Subject
Royal Oak Mobile Home Park Water Meter Project
Area
Royal Oak Mobile Home Park
Project Number
UCP 3082
Supplemental fields
SmeadsoftID
7514
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applicants Name: <br />Project/ Subdivision Name: <br />Applicants Contact Person: <br />Location/Street Address: <br />INDIAN RIVER COUNTY- WATER AND SEWER CONNECTION FEES <br />Royal Oak Mobile Home Park.xls <br />Bill Lain <br />Phone #: <br />Royal Oak Mobile Home Park Cell #: <br />Bill Lain Fax #: <br />8125 US Highwat 1, Vero Beach, FL 32967 a -Mail: <br />772-564-6707 <br />Parcel ID ('s) #: <br />Fire Protection Service? (Yes / No) No (REQUIRED) <br />Master Meter? (Yes / No) Yes (REQUIRED) <br />In the Remards, please Indicate Number of Master Meters & if <br />supplied by Owner or County. <br />APPLICABLE CODE <br />( I) Indian River County/City of Sebastian <br />( V) City of Vero Beach I Water <br />( F) Franchise Utility Sewer <br />( N) No Service Available (REQUIRED FIELDS) <br />For Concurrency Only? (Yes / No) No (REQUIRED) <br />REMARKS: <br />Description / Qualifier <br />ERU's <br />@ <br />Car Wash (Enter gallons per day) <br />Grand Total: <br />1 39.00 <br />Commercial Entersquare footage) <br />2,500 sf <br />1.00 <br />Historical Use Enter gallons per da <br />$1,105.00 <br />Each (Multi -Family) <br />Hotel / Motel(Enter # of Units <br />403885.00 <br />Industrial (Enter square footage) <br />only. <br />at the <br />2 Inch @ $1,020.00 per Connection by IRC <br />Irrigation (Enter gallons per day) <br />and confirmation at time <br />Water <br />Mini -Storage (Enter # of Units) <br />39 Deposit @ $50.00 per ERU <br />= $ <br />Multi -Family/ Qualified Mfg. Home <br />Water <br />Inspection: <br />(Enter # of Units) <br />37 units <br />37.00 <br />Nursing Homes, Children's Homes, etc. <br />Installation <br />--- <br />Enter # Beds <br />Enter # Staff) <br />1 Inch @ $250.00 per Meter <br />= $ <br />Office Entersquare footage) <br />Residential Units Enter # of homes <br />1 homes <br />1.00 <br />Restaurant Enter # of Seats <br />2 Inch @ $630.00 per Meter <br />School Enter # of students <br />Swimming Pools Enter # of Pools <br />Warehouse Entersquare footage) <br />Other Enter # of ERU's <br />Sub Total: <br />39.00 <br />Existin ERU's Enter # of Existing ERU's <br />ERU's <br />@ <br />$1,300.00 <br />Grand Total: <br />1 39.00 <br />Water Capacity Charges: 2 <br />ERU's <br />@ <br />$1,300.00 <br />Each <br />= $ <br />21600.00 <br />37 <br />ERU's <br />@ <br />$1,105.00 <br />Each (Multi -Family) <br />= $ <br />403885.00 <br />Water <br />Service Connection: <br />5/8 Inch @ $400.00 per Connection by IRC <br />= $ <br />Total Balance Due *** <br />1 Inch @ $460.00 per Connection by IRC <br />= $ <br />_ $ 45,460-02il <br />11/2 Inch @ $810.00 per Connection by IRC <br />= $ <br />***Charges and fees are estimates <br />of payment. Base Fees will accrue <br />only. <br />at the <br />2 Inch @ $1,020.00 per Connection by IRC <br />= $ <br />and confirmation at time <br />Water <br />Deposit: <br />39 Deposit @ $50.00 per ERU <br />= $ <br />1,950.00 <br />Water <br />Inspection: <br />1 Fee @ $25.00 Each per Connection <br />= $ <br />25.00 <br />Meter <br />Installation <br />5/8 Inch @ $130.00 per Meter <br />= $ <br />1 Inch @ $250.00 per Meter <br />= $ <br />11/2 Inch @ $500.00 per Meter <br />= $ <br />2 Inch @ $630.00 per Meter <br />= $ <br />Water Line Extension Fees: Per Developer's Agreement $ <br />Water Line Extension Fees: FT @ $11.25 / FT = $ <br />Sewer Capacity Charges: ERU's @ $2,796.00 Each = $ <br />ERU's @ $2,376.60 Each (Multi -Family) _ $ <br />Sewer Lateral: <br />Sewer Deposit: <br />Sewer Inspection: <br />Sewer Line Extension Fees: <br />Sewer Line Extension Fees: <br />Prepared By <br />Michael C. Hotchkiss <br />Date Prepared <br />4/18/2008 <br />Taps @ $500.00 Each per Connection by IRC = $ <br />Deposit @ $50.00 per ERU = $ <br />Fee @ $25.00 Each per Connection = $ <br />Per Developer's Agreement $ <br />FT @ $15.77 / FT = $ <br />Attachment 5 <br />Total Balance Due *** <br />_ $ 45,460-02il <br />***Charges and fees are estimates <br />of payment. Base Fees will accrue <br />only. <br />at the <br />Actual charges are subject <br />time connection fees have <br />to review <br />been paid. <br />and confirmation at time <br />Attachment 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.