My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-164
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 11:39:14 AM
Creation date
9/30/2015 9:42:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/16/2006
Control Number
2006-164
Agenda Item Number
11.I.4.
Entity Name
510 Group, LLC
Subject
Developer's agreement for Bluewater Bay
Area
89th Street and CR 510
Project Number
PD-04-10-19 (2001080013-46608)
Supplemental fields
SmeadsoftID
5633
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEVELOPER'S AGREEMENT BETWEEN <br />INDIAN RIVER COUNTY, FLORIDA <br />AND <br />510 GROUP, L.L.C. <br />FOR BLUEWATER BAY RESIDENTIAL PLANNED DEVELOPMENT <br />THIS AGREEMENT, entered this __&tlxlay of <br />2006, by and between <br />INDIAN D4cTD r�Ort`rry DT nnrn A l:. Ld. r,L f, i pA.. n�th <br />. C UN A i, a•a�vavLr� a po Itlt,at Snu iviSiVii G1 IIIc .State Gt rlGi Ida, 1li40 25 <br />Street, Vero Beach, Florida, 32960, hereafter called COUNTY and 510 GROUP, L.L.C., 1974 14'h <br />Avenue, Vero Beach, Florida 32960, telephone number (772) 567-9255, hereafter referred to as <br />DEVELOPER. <br />WITNESSETH <br />WHEREAS, the DEVELOPER has applied to develop a 379 -unit residential development to <br />be known as BLUEWATER BAY on 141.79 acres of land located on the north side of CR 510, <br />between 90'h Avenue and 86`h Avenue in Indian River County, Project Number PD -04-10-19 <br />(2001080013-46608), the legal description is attached as Exhibit "A" and incorporated herein by <br />reference, and; <br />WHEREAS, the COUNTY and DEVELOPER share mutual concerns with respect to <br />construction of: <br />1. The <br />east leg <br />of the intersection of <br />89" <br />Street and CR 510, aligned with 89th Street <br />west <br />of CR <br />510, accommodating <br />the <br />Sebastian River High School driveway and <br />upgraded signalization at that intersection. <br />2. Eastbound left -turn lane and westbound right -turn lane on CR 510 at 86th Avenue. <br />3. Sidewalk connection to Liberty Magnet School and CR 510 sidewalk. <br />4. Eastbound right -turn lane at the development's 89`' Street entrance and southbound <br />left -turn lane on CR 510 at 89'h Street. <br />5. Five-foot (5') sidewalks along <br />the development's CR 510, 89th Street <br />and <br />86'h <br />Avenue frontages together with <br />connections to the development's internal <br />four -foot <br />(4') sidewalk system. <br />WHEREAS, if the COUNTY project to widen CR 510 from 2 -lanes to 4 -lanes is approved <br />and scheduled to commence construction prior to January 1, 2008, then the DEVELOPER is not <br />required to construct CR 510 widening or associated above turn lanes; and <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.