Laserfiche WebLink
The Developer shall also dedicate by deed or other instrument right-of--way to meet the <br /> County's 60' minimum right-of--way width for the existing deficient portion of 23d Street SW <br /> directly abutting the site . <br /> Developer shall also dedicate by deed or other instrument , an 80' right-of--way for 21 st Street <br /> SW directly abutting the north line of the existing 60' wide Indian River Farms Water Control <br /> District Water Control District's (IRFWCDIs) Sub-lateral B- 10 Canal right-of-way. No <br /> compensation for said right-of--way dedications shall be required of the County. <br /> The above described dedications are depicted in Exhibit " B' . <br /> 3 . Murphy Deed Release : Simultaneous with the dedication of right-of-way by the <br /> Developer for 27th Avenue as described herein in Item #3 ; County shall release to Developer <br /> all Murphy Deed reservations on the project site along the project's 27th Avenue frontage <br /> lying west of a line 65' parallel to and west of the north-south section line at 27th Avenue . <br /> The above described Murphy Deed Release Parcel is depicted in Exhibit "C" <br /> 4 . Site Access & 21 Street SW Improvements : Developer shall provide access to the <br /> Project by constructing Project entrances , as follows : <br /> A . The entrance for the Project on 21st Street SW for the portion of the Project north <br /> of 21 st Street shall be constructed approximately 1 , 800 feet west of 27'h Avenue . The <br /> Developer shall construct a two- lane road from 27th Avenue west to said entrance of <br /> the Project , as shown on the Board of County Commissioners approved Conceptual <br /> Planned Development. The Developer will also plan , design and construct <br /> westbound right-tum lane and westbound left-turn lane at said 21st Street SW <br /> entrance . The westbound left-tum lane shall be completed to serve the proposed <br /> entrance to the portion of the Project south of 21st Street SW. The DEVELOPER <br /> shall also construct an eastbound right-tum lane and an eastbound left-tum lane at <br /> the 27th Avenue approach . In addition , a northbound left-tum lane , a southbound <br /> right-tum lane and southbound left-tum lane shall be constructed on 27th Avenue at <br /> its intersection with 21st Street SW. All road construction shall be in compliance with <br /> applicable Indian River County and Florida Department of Transportation standards . <br /> B . The entrance for the Project on 21st Street SW for the portion of the Project south <br /> of 21 st Street SW shall directly align with the 21 st Street SW entrance to the portion of <br /> the Project north of 21st Street SW as depicted on the Board of County <br /> Commissioners approved Conceptual Planned Development Plan . <br />