Laserfiche WebLink
Task III <br /> 1 . Provide on-site inspection services. <br /> a. Estimated construction time of 45 days to substantial completion and 60 days to final completion. <br /> b. Site inspection based on a 3 days per week basis, 3 hours per visit during the construction period. <br /> Estimated Fee : $5895 .00 <br /> Task IV <br /> 1 . Provide record drawings from contractor supplied as-built drawings (signed by a Florida registered land <br /> surveyor). <br /> 2 . Provide final certification to all appropriate agencies. <br /> Estimated Fee: $2350.00 <br /> Proposed Fee Schedule: <br /> Engineering Services @ $ 105 .00 per hour <br /> Construction Inspection @ $65 .00 per hour <br /> Task I <br /> Engineering Services, 10 hours. . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1050.00 <br /> Construction Inspection, 4 hours . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $260.00 <br /> TaskI Subtotal .................................................................................. $1310.00 <br /> Task 11 <br /> Engineering Services, 4 hours. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $420 .00 <br /> Construction Inspection, 6 hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $390.00 <br /> Task11 Subtotal .................................................................................. $810.00 <br /> Task III (Assumes a 9 week total construction period.) <br /> Engineering Services, 6 hours. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $630.00 <br /> Construction Inspection, 81 hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $5265 .00 <br /> TaskIII Subtotal ............................................................................... $5895.00 <br /> Task IV <br /> Engineering Services, 10 hours. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1050.00 <br /> Construction Inspection, 20 hours . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1300.00 <br /> TaskIV Subtotal ............................................................................... $2350.00 <br /> Total ......................................................................$ 10,365.00* <br /> *Direct costs, per general conditions, are estimated at $ 1 ,000.00. <br /> We propose to provide the above-described engineering services for a total estimated fee, of $ 10,365 .00. <br /> Billing will be monthly and will be based on the hourly rates below, plus direct costs as stated in our Standard <br /> Provisions section. All billing for sub-consultants will be at direct cost in accordance with our Standard <br /> Provisions. If at any time during evaluation and design of the herein proposed services it becomes apparent <br /> that the described scope of work changes, we will immediately notify you, in writing, prior to making such <br /> changes . Such changes will be considered additional services requiring written authorization and will be <br /> provided on an hourly basis at the following hourly rates : <br /> Initial WF _ Initial Client <br /> proposal-finall Page 2 of 5 <br />