Laserfiche WebLink
ENGINEER'S COST ESTIMATE <br /> DIAMOND COURT VILLAGE <br /> 7/20/2004 <br /> I, John H. Blum, P.E. , a Florida Registered Engineer, License No. 45813 , do hereby certify that cost estimate has been <br /> prepared under my responsible direction for those remaining improvements listed below and that the total cost estimated <br /> for said improvements is $318,602.29. This estimate has b prepared, in part, for the purposes of establishing proper <br /> surety amounts associated with the approval by Indian River ounty of a ,al Plat for the Diamond Court Village. <br /> ZE= V1 <br /> 1a <br /> �Johi H. Blum, P .E. #45513 Da e: <br /> ITEM LININ' TOTAL <br /> NO. DESCRIPTION Q ANTITY UNIT PRICF AMOUNT <br /> 1 .00 EARTHWORK <br /> 1 . 10 Final Dress & Clean Up 1 L.S . $ 13 ,750.00 $ 139750.00 <br /> 1 . 12 Sod for Lake Slopes 79012 S .Y. $ 1 .43 $ 10,027 . 16 <br /> 1 . 13 Sod for Curb (2) 19086 S .Y. $ 1 .43 $ 1 ,552.98 <br /> Sub-Total $259330 . 14 <br /> 2.00 PAVING <br /> 2.01 8" Stabilized Subgrade 7,575 S.Y. $2.20 $ 16,665 .00 <br /> 2.02 6" Limerock/Coquina Base 59945 S .Y. $6.33 $37,631 . 85 <br /> 2.03 1 " S-I Asphalt 5,945 S .Y. $3 .58 $21 ,283 . 10 <br /> 2.04 Striping & Signage 1 L.S . $2,420.00 $2,420.00 <br /> 2.05 Miami Curb 4,891 L.F. $7.54 $36,878 . 14 <br /> 2.06 Type D Curb 248 L.F. $8.58 $2, 127 .84 <br /> 2.07 Sidewalk (4' Wide) % 152 S .F. $2 .70 $249710.40 <br /> 2.08 Sidewalk (5' Wide) 41525 S .F. $2.70 $ 122217 .50 <br /> Sub-Total $ 153 ,933 .83 <br /> 3.00 DRAINAGE <br /> 3 . 11 18" MES 2 EACH $533 .50 $ 1 ,067.00 <br /> 3 . 12 24" MES 1 EACH $660.00 $660.00 <br /> 3 . 13 36" MES 1 EACH $ 1 ,595 .00 $ 1 ,595 .00 <br /> 3 . 14 Concrete Collars 1 EACH $275 .00 $275 .00 <br /> Sub-Total $3 ,597.00 I�t <br /> s` <br /> 9 Y <br /> Page 1 <br />