My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-213
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-213
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2016 11:08:24 AM
Creation date
9/30/2015 6:44:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
08/19/2003
Control Number
2003-213
Agenda Item Number
11.I.3
Entity Name
Dickerson Florida, Inc.
Subject
Change Order No. 001 East Gifford Stormwater Improvements
Project Number
9219
Archived Roll/Disk#
3162
Supplemental fields
SmeadsoftID
3363
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> CHANGE ORDER NO . 001 O 3 , a l S <br /> DATE OF ISSUANCE : August 19 , 2003 EFFECTIVE DATE : August 19 , 2003 <br /> OWNER : Indian River County <br /> CONTRACTOR : DICKERSON FLORIDA , INC . <br /> Project : EAST GIFFORD STORMWATER IMPROVEMENTS <br /> OWNER's Project No . 9219 <br /> OWNER/ENGINEER : Indian River County <br /> You are directed to make the following changes in the Contract Documents : <br /> 1 . Description : Add two Type " E " Inlets . <br /> Reason : To adjust elliptical pipe route (along U . S . Highway No . 1 ) to avoid conflicts <br /> with power poles and an existing water main . <br /> The change in Contract Price is determined as follows : <br /> ADDITION to the Contract Price = (2 Type " E " Inlets ) ($ 2 , 200 per Inlet) <br /> = $4, 400 . 00 <br /> 2 . Description : Additional labor to modify two Type " E " Inlets on site . <br /> Reason : Inlets required modification due to adjustment of elliptical pipe route (along <br /> U . S . Highway No . 1 ) to avoid conflicts with power poles and an existing water main . <br /> The change in Contract Price is determined as follows : <br /> ADDITION to the Contract Price = $ 990 <br /> 3 . Description : Construct thrust blocks for an existing water main . <br /> Reason : To protect an existing water main against resultant thrust from internal <br /> pipeline pressure in order to allow the installation of a drainage structure near the <br /> water main . The water main must be exposed in order to install the drainage <br /> structure and the thrust blocks will prevent the water main ' s internal pressure from <br /> blowing the fittings or pipe sections from the pipeline . <br /> The change in Contract Price is determined as follows : <br /> ADDITION to the Contract Price = $ 3 , 307 . 70 <br /> ADDITION to the Contract Time = 2 calendar days <br /> 4 . Description : Remove and replace an existing 15-inch corrugated metal pipe ( CMP ) <br /> at an existing drainage structure . <br /> Reason : Since the construction drawings were prepared , a new pipe was added ( by <br /> others ) to an existing drainage structure that the Contractor must connect to as part <br /> of this project . This pipe must be removed to allow the Contractor to perform its <br /> work and then the Contractor must reinstall the pipe . <br /> The change in Contract Price is determined as follows : <br /> ADDITION to the Contract Price = $ 621 . 50 <br /> Change Order #001 <br /> Change Order - 1 <br /> R\Public WorksWeithM\Stormwater Projects\Gifford East\Change Orders\Change Order #001 .doc Last revised 9/27/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.