Laserfiche WebLink
GENERAL NOTES <br /> 1 . LANDSCAPE CONTRACTOR 15 RESPONSIBLE FOR VERIFYING LOCATIONS OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR <br /> TO COMMENCING WORK . ALL UTILITY COMPANIES AND/OR THE GENERAL CONTRACTOR SHALL BE NOTIFIED TO VERIFY UTILITY <br /> LOCATIONS PRIOR TO DIGGING. UTILITY TRENCHING IS TO BE COORDINATED WITH THE TREE RELOCATION PLANS PRIOR TO <br /> BEGINNING OF PROJECT. THE OWNER SHALL NOT BE RESPONSIBLE FOR DAMAGE TO UTILITY OR IRRIGATION LINES. <br /> 2. LANDSCAPE CONTRACTOR SHALL EXAMINE THE SITE AND BECOME FAMILIAR WITH CONDITIONS AFFECTING THE INSTALLATION <br /> PRIOR TO SUBMITTING BIDS , FAILURE TO DO SO SHALL NOT BE CONSIDERED CAUSE FOR FUTURE EXTRAS OR COMPLAINTS . <br /> 3 . EXISTING TREES AND PALMS TO REMAIN SHALL BE PROTECTED DURING CONSTRUCTION. TREE PROTECTION MEASURE SHALL <br /> BE ERECTED AROUND THE TREES AND PALMS TO REMAIN AND SHALL BE MAINTAINED FUNCTIONAL THROUGHOUT THE DURATION <br /> OF THE PROJECT . <br /> 4. A CERTIFIED ARBORIST CERTIFIED BY THE INTERNATIONAL SOCIETY OF ARBORICULTURE SHALL BE PRESENT ON SITE TO <br /> DIRECT ALL ROOT PRUNING AND/OR CANOPY TRIMMING ACTIVITIES. ROOT PRUNING AND CANOPY TRIMMING SHALL PRODUCE <br /> A CLEAN CUT. COST TO BE INCLUDED /N THE RELATED BID ITEM . <br /> 5 . NO PLANT MATERIAL SHALL BE ACCEPTED SHOWING EVIDENCE OF CABLE MARXSr CHAIN MARKS, EQUIPMENT SCARS, OR WHEN <br /> THE BALL OF EARTH SURROUNDING ITS ROOTS HAS BEEN CRACKED, BROKEN OR OTHERWISE DAMAGED. <br /> 6 . ALL TREE AND/OR PALM REMOVALS SHALL BE IN ACCORDANCE WITH SECTION 110 OF THE STANDARD SPECIFICATIONS. <br /> 7 . THE SPECIFIC PROPOSED LOCATION FOR RELOCATED PALMS SHALL BE COORDINATED /N THE FIELD BY THE F .D.O. T. PROJECT <br /> ENGINEER AND THE DISTRICT SIX ENVIRONMENTAL MANAGEMENT LANDSCAPE ARCHITECT . <br /> B . THE CONTRACTOR SHALL CONTACT THE DISTRICT FOUR ENVIRONMENTAL MANAGEMENT PERMIT COMPLIANCE MONITOR AT LEAST <br /> 72 HOURS PRIOR TO THE COMMENCEMENT OF ANY TREE RELOCATION, LANDSCAPE INSTALLATION OR ANY OTHER LANDSCAPE <br /> ACTIVITIES. <br /> 9 . THE CONTRACTOR IS ADVISED THAT LANDSCAPE MONITORING WILL BE REQUIRED DURING ANY LANDSCAPE ACTIVITIES AND THAT <br /> CLAIMING DELAY DUE TO MONITORING ACTIVITIES SHALL NOT BE ALLOWED. <br /> 10. THE CONTRACTOR SHALL TAKE CARE TO PROTECT ALL TREES AND LANDSCAPING MATERIAL WITHIN THE PROJECT LIMITS WHICH <br /> ARE NOT DESIGNATED FOR RELOCATION. TREES IMMEDIATELY ADJACENT TO BUT OUTSIDE OF THE RIGHT OF WAY LINE ALSO <br /> SHALL NOT BE IMPACTED. IF THE EXISTING LANDSCAPE MATERIAL OR OTHER RELATED MATERIALS ARE IMPACTED DURING <br /> CONSTRUCTION OR AS A RESULT OF EQUIPMENT STAGING THEN THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REPLACEMENTS <br /> AND ALL ASPECTS OF REMEDIATION INCLUDING, BUT NOT LIMITED TO TREES, SHRUBS, GROUND COVERS AND ANY OTHER <br /> LANDSCAPE -RELATED MATERIALS IMPACTED BY CONSTRUCTION . ALL IMPACTED LANDSCAPING MUST BE REPLACED WITH ITEMS OF <br /> SIMILAR SIZE AND VALUE, AND MUST BE SATISFACTORY TO THE FOOT PROJECT ENGINEER, WHO WILL COORDINATE WITH THE <br /> FOOT DISTRICT LANDSCAPE ARCHITECT. THE COST OF THE REPLACEMENTS SHALL BE THE CONTRACTOR'S RESPONSIBILITY . <br /> THE ESTABLISHMENT OF THE REPLACEMENT MATERIAL SHALL BE WARRANTED BY THE CONTRACTOR FOR A PERIOD OF ONE <br /> YEAR AS PER ROADWAY AND BRIDGE STANDARD SPECIFICATION 580-11. ' COST FOR TREE PROTECTION MEASURES WILL BE INCLUDED <br /> IN PAY ITEM NUMBER 580-1-2 LANDSCAPE COMPLETE . <br /> ll. LANDSCAPE MAINTENANCE DURING THE ESTABLISHMENT PERIOD SHALL BE IN ACCORDANCE WITH SECTION 580 OF THE STANDARD <br /> SPECIFICATIONS. COST TO BE INCLUDED IN THE RELATED BID ITEM . <br /> PLANTING NOTES <br /> I. LANDSCAPE CONTRACTOR SHALL COORDINATE WORK WITH THAT OF THE ROADWAY GENERAL CONTRACTOR. <br /> 2. ALL PLANT AREAS AND PLANT PITS SHALL BE TESTED FOR SUFFICIENT PERCOLATION PRIOR TO FINAL PLANTING TO ENSURE <br /> PROPER DRAINAGE . PLANT BEDS IN AREAS COMPACTED BY HEAVY EQUIPMENT SHALL BE DE -COMPACTED 50 THAT DRAINAGE <br /> IS NOT IMPEDED. <br /> 3 . LANDSCAPE CONTRACTOR TO PROVIDE ALL PLANTS WITH FERTILIZER 30 DAYS AFTER INSTALLATION . IT SHALL HAVE A CHEMICAL <br /> DESIGNATION AS INDICATED: TREES: 6 -6 -6 N -P-Kr WITH 11/CRONUTR/ENTS . <br /> 4 . MAINTAIN SOIL MOISTURE /N THE ROOT ZONE AT AN OPTIMUM LEVEL FOR HEALTHY GROWTH . PROVIDE ENOUGH WATER TO <br /> FILL THE WATERING RING TO THE TOP, OR APPROXIMATELY 64 OF WATER. DEEP WATER THE ENTIRE ROOTBALL AREA AT A <br /> MINIMUM ACCORDING TO THE FOLLOWING SCHEDULEt COST TO BE INCLUDED IN THE RELATED BID ITEM: <br /> WHEN FREQUENCY <br /> FIRST WEEK ONCE DAILY <br /> NEXT SEVEN WEEKS EVERY OTHER DAY <br /> NEXT TWO MONTHS TWICE A WEEK (MINIMUM 3 DAY INTERVAL) <br /> R E V I S / 0 N 5 STATS OF FLORIDA SHEET <br /> DATE DESCRIPTION I GATE BY DESCRIPTION ®BL'RM¢L1A AIAMIL k PARTN2RS ING <br /> wMELL4 AJ - uJap& PA - NER& DEPARTMENT OF 7RANSFlDRTA770N N0. <br /> . • u "'°' <br /> ROAD No. LUUNTY FINANCIAL PROJECT la LANDSCAPE NOTES <br /> LD -9 <br /> S .R . 5 INDIAN RIVER 228615 -1 -52 -01 <br /> cxrvr_ n n �immwnw uu uw <br /> �u3ENs �n9i2')OS 429:]3 Pw �wmrrvuviorumrrarrampialsn2Te6'9vanrp�rmllpCr epn <br />