Laserfiche WebLink
D . CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br /> ■' in or relating to existing surface or subsurface structures at or contiguous to the Site <br /> (except Underground Facilities) which have been identified in the Supplementary <br /> Conditions as provided in paragraph 4 . 02 of the General Conditions and (2) reports and <br /> r• drawings of a Hazardous Environmental Condition , if any, at the Site which have been <br /> identified in the Supplementary Conditions as provided in paragraph 4 . 06 of the General <br /> Conditions . <br /> w <br /> E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> done so) all additional or supplementary examinations , investigations , explorations , tests , <br /> studies , and data concerning conditions (surface , subsurface , and Underground Facilities) <br /> r at or contiguous to the Site which may affect cost , progress , or performance of the Work <br /> or which relate to any aspect of the means, methods , techniques , sequences , and <br /> procedures of construction to be employed by CONTRACTOR , including applying the <br /> specific means , methods , techniques , sequences , and procedures of construction , if any, <br /> ow expressly required by the Contract Documents to be employed by CONTRACTOR , and <br /> safety precautions and programs incident thereto <br /> r F . CONTRACTOR does not consider that any further examinations , investigations , <br /> explorations , tests , studies , or data are necessary for the performance of the Work at the <br /> r. Contract Price , within the Contract Times , and in accordance with the other terms and <br /> conditions of the Contract Documents . <br /> G . CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br /> others at the Site that relates to the Work as indicated in the Contract Documents . <br /> H . CONTRACTOR has correlated the information known to CONTRACTOR , information and <br /> rr. observations obtained from visits to the Site , reports and drawings identified in the <br /> Contract Documents, and all additional examinations , investigations , explorations , tests , <br /> studies , and data with the Contract Documents . <br /> I . CONTRACTOR has given ENGINEER written notice of all conflicts , errors , ambiguities , or <br /> discrepancies that CONTRACTOR has discovered in the Contract Documents , and the <br /> written resolution thereof by ENGINEER is acceptable to CONTRACTOR . <br /> J . The Contract Documents are generally sufficient to indicate and convey understanding of <br /> .. all terms and conditions for performance and furnishing of the Work. <br /> r <br /> 0016-00520 - Agreement (Public Works) <br /> 00520 - 5 <br /> +r C:\Documents and Settings\kjackson\Local Settings\Temporary Internet Files\OLK86\0016-00520 - Agreement (Public W orks).doc Rev. 05/01 <br />