Laserfiche WebLink
D . CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br /> in or relating to existing surface or subsurface structures at or contiguous to the Site <br /> (except Underground Facilities ) which have been identified in the Supplementary <br /> Conditions as provided in paragraph 4 . 02 of the General Conditions and (2) reports and <br /> drawings of a Hazardous Environmental Condition , if any, at the Site which have been <br /> identified in the Supplementary Conditions as provided in paragraph 4 . 06 of the General <br /> Conditions . <br /> E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> done so) all additional or supplementary examinations , investigations , expiorations , tests , <br /> studies , and data concerning conditions (surface , subsurface', and Underground Facilities ) <br /> at or contiguous to the Site which may affect ,cost, progress , .or.performance of the Work <br /> or which relate to any aspect of the means , methods 4,&ch niques , sequences , and <br /> procedures of construction to be . ,employed ;aay CONTRACTOR , including applying the <br /> specific means , methods , techniques ,, sequencesand procedures of construction , if any, <br /> expressly required by the Contract ,Documents to 'be employed <' by CONTRACTOR , and <br /> safety precautions and .: programs incidentthereto <br /> F . CONTRACTOR, does .;not consider .that any further examinations , investigations , <br /> explorations , tests , studies , or data are necessary for the performance of the Work at the <br /> Contract Price, within the Contract Times , and in accordance with the other terms and <br /> conditions ofjhe Contract°:Documents: <br /> G . CONTRACTOR is. aware. 'of the general nature of work to be performed by OWNER and <br /> others at :the Site that relates to the Work as indicated in the Contract Documents , <br /> H . CONTRACTOR has correlated the information known to CONTRACTOR , information and <br /> observations obtained from visits to the Site , reports and drawings identified in the <br /> Contract Documents , and all additional examinations , investigations , explorations , tests , <br /> studies , and data with the Contract Documents , <br /> I . CONTRACTOR has given ENGINEER written notice of all conflicts , errors , ambiguities , or <br /> discrepancies that CONTRACTOR has discovered in the Contract Documents , and the <br /> written resolution thereof by ENGINEER is acceptable to CONTRACTOR . <br /> J . The Contract Documents are generally sufficient to indicate and convey understanding of <br /> all terms and conditions for performance and furnishing of the Work . <br /> 0016-00520 - Agreement (Public Works ) <br /> 00520 - 5 <br /> R\Engineering\Capital Projects\0016 & 0236- 41st Street Improvements\0016 & 0236-41st St Contract Docs\0016.00520 - Agreement (Public Works).doc Rev. 05/01 <br />