D . CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of
<br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions
<br /> in or relating to existing surface or subsurface structures at or contiguous to the Site
<br /> (except Underground Facilities ) which have been identified in the Supplementary
<br /> Conditions as provided in paragraph 4 . 02 of the General Conditions and (2) reports and
<br /> drawings of a Hazardous Environmental Condition , if any, at the Site which have been
<br /> identified in the Supplementary Conditions as provided in paragraph 4 . 06 of the General
<br /> Conditions .
<br /> E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
<br /> done so) all additional or supplementary examinations , investigations , expiorations , tests ,
<br /> studies , and data concerning conditions (surface , subsurface', and Underground Facilities )
<br /> at or contiguous to the Site which may affect ,cost, progress , .or.performance of the Work
<br /> or which relate to any aspect of the means , methods 4,&ch niques , sequences , and
<br /> procedures of construction to be . ,employed ;aay CONTRACTOR , including applying the
<br /> specific means , methods , techniques ,, sequencesand procedures of construction , if any,
<br /> expressly required by the Contract ,Documents to 'be employed <' by CONTRACTOR , and
<br /> safety precautions and .: programs incidentthereto
<br /> F . CONTRACTOR, does .;not consider .that any further examinations , investigations ,
<br /> explorations , tests , studies , or data are necessary for the performance of the Work at the
<br /> Contract Price, within the Contract Times , and in accordance with the other terms and
<br /> conditions ofjhe Contract°:Documents:
<br /> G . CONTRACTOR is. aware. 'of the general nature of work to be performed by OWNER and
<br /> others at :the Site that relates to the Work as indicated in the Contract Documents ,
<br /> H . CONTRACTOR has correlated the information known to CONTRACTOR , information and
<br /> observations obtained from visits to the Site , reports and drawings identified in the
<br /> Contract Documents , and all additional examinations , investigations , explorations , tests ,
<br /> studies , and data with the Contract Documents ,
<br /> I . CONTRACTOR has given ENGINEER written notice of all conflicts , errors , ambiguities , or
<br /> discrepancies that CONTRACTOR has discovered in the Contract Documents , and the
<br /> written resolution thereof by ENGINEER is acceptable to CONTRACTOR .
<br /> J . The Contract Documents are generally sufficient to indicate and convey understanding of
<br /> all terms and conditions for performance and furnishing of the Work .
<br /> 0016-00520 - Agreement (Public Works )
<br /> 00520 - 5
<br /> R\Engineering\Capital Projects\0016 & 0236- 41st Street Improvements\0016 & 0236-41st St Contract Docs\0016.00520 - Agreement (Public Works).doc Rev. 05/01
<br />
|