My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-270
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-270
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2016 11:41:33 AM
Creation date
9/30/2015 6:59:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/14/2003
Control Number
2003-270
Agenda Item Number
7.K.
Entity Name
HVAC Mechanical Inc.
Subject
Douglass Cafeteria air conditioning system
Area
Douglass School
Bid Number
6015
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3454
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5 . ACCEPTANCE AND FINAL PAYMENT <br /> When the work provided for under this contract has been completed, in accordance with the terms <br /> thereof, that a lump sum payment request in the amount of such work shall be prepared by the <br /> CONTRACTOR, and filed with the OWNER within fifteen days after the date of completion. <br /> The final estimate shall be accompanied by a Certificate of Acceptance issued by the ENGINEER, <br /> stating that the work has been completed to his satisfaction, in compliance with the Contract. The <br /> Certificate of Acceptance shall not be issued until completed Asbuilt drawings of the actual <br /> construction have been furnished to the OWNER and verified . <br /> In accordance with the Florida Prompt Payment Act, after receipt of the ENGINEER ' S final <br /> acceptance by the OWNER, the OWNER shall make payment to the CONTRACTOR in the full <br /> amount . PAYMENT of the lump sum amount and acceptance of such payment by the <br /> CONTRACTOR shall release the OWNER from all claims or liabilities to the CONTRACTOR in <br /> connection with this Contract . <br /> Article 6 . THE CONTRACT DOCUMENTS <br /> The Instruction to Bidders , General Conditions , Special Provisions, Submittals , Delivery Storage and <br /> Handling, Technical Specifications , Bid Documents , Insurance Requirements (Exhibit A) , Bonds , <br /> and the Drawings dated September 5 , 2003 prepared by TLC Engineering Inc , together with this <br /> Agreement, form the Contract, and are fully a part of this Contract as if included herein. <br /> Article 7 . VENUE <br /> This agreement shall be governed by the laws of the State of Florida. Venue for any lawsuit brought <br /> by either party against the other party or otherwise arising out of this agreement shall be in Indian <br /> River county, Florida, or in the event of federal jurisdiction, in the United States District Court for the <br /> Southern District of Florida. <br /> (CONTRACTOR) (OWNER) <br /> HVAC Mechanical, Inc . INDIAN RIVER COUNTY FLORIDA <br /> Frank O . Monti, President C Chairman <br /> Witnessed by: i� Approved by BCC ' "411041 <br /> Arl JJ 71 Attest : <br /> Je Barton, Clo Circuit Court <br /> T� <br /> y Attorney Deputy Clerk <br /> Approved as to Form and Legal Sufficiency <br /> v � G <br /> J mes E handle , County Administrator <br /> Indian River Co. Approved Date <br /> Administration P .100P / V <br /> Le t <br /> Budget <br /> Department <br /> Page 2 of 2 90k `�`" fo- �8 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.