Laserfiche WebLink
SUBMITTALS <br /> PART L GENERAL <br /> 1 . 01 DESCRIPTION OF REQUIREMENTS <br /> A . This Section specifies the general methods and requirements of submissions applicable <br /> to the following work-related submittals : Shop Drawings , Product Data, Samples , <br /> Construction Photographs , and Construction or Submittal Schedules . Additional <br /> general submission requirements are contained in the General Conditions . Detailed <br /> submittal requirements will be specified in the technical specifications sections . <br /> B . All submittals shall be clearly identified by reference to Specification Section , <br /> Paragraph , Drawing No . or Detail as applicable . Submittals shall be clear and legible <br /> and of sufficient size for sufficient presentation of data. <br /> 1 . 02 SHOP DRAWINGS , PRODUCT DATA , SAMPLES <br /> A . Shop Drawings <br /> 1 . Shop drawings , as defined in the General Conditions , and as specified in <br /> individual work Sections include , but are not necessarily limited to , <br /> custom-prepared data such as fabrication and erection/installation (working) <br /> drawings , scheduled information , setting diagrams , actual shop work <br /> manufacturing instructions , custom templates , special wiring diagrams , <br /> coordination drawings , individual system or equipment inspection and test <br /> reports including performance curves and certifications , as applicable to the <br /> Work . <br /> 2 . All shop drawings submitted by subcontractors for approval shall be sent <br /> directly to the CONTRACTOR for checking . The CONTRACTOR shall be <br /> responsible for their submission at the proper time so as to prevent delays in <br /> delivery of materials . <br /> 3 . The CONTRACTOR shall check all subcontractors ' shop drawings regarding <br /> measurements , size of members , materials , and details to satisfy himself that <br /> they conform to the intent of the Drawings and Specifications . Shop drawings <br /> found to be inaccurate or otherwise in error shall be returned to the <br /> subcontractors for correction before submission thereof. <br /> 4 . All details on shop drawings submitted for approval shall show clearly the <br /> relation of the various parts to the main members and lines of the structure , and <br /> where correct fabrication of the work depends upon field measurements , such <br /> measurements shall be made and noted on the drawings before being submitted <br /> for approval . <br /> Page 18 of 55 <br />