My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-270
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-270
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2016 11:41:33 AM
Creation date
9/30/2015 6:59:27 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/14/2003
Control Number
2003-270
Agenda Item Number
7.K.
Entity Name
HVAC Mechanical Inc.
Subject
Douglass Cafeteria air conditioning system
Area
Douglass School
Bid Number
6015
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3454
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DELIVERY, STORAGE AND HANDLING <br /> PART 1 : GENERAL <br /> 1 . 01 SCOPE OF WORK <br /> A . This Section specifies the general requirements for the delivery handling, storage and <br /> protection for all items required in the construction of the work . Specific requirements , if any, <br /> are specified with the related item . <br /> 1 . 02 TRANSPORTATION AND DELIVERY <br /> A . Transport and handle items in accordance with manufacturer's instructions . <br /> B . Schedule delivery to reduce long-term on -site storage prior to installation and/or operation . <br /> Under no circumstances shall equipment be delivered to the site more than one month prior to <br /> installation without written authorization from the Engineer. <br /> C . Coordinate delivery with installation to ensure minimum holding time for items that are <br /> hazardous , flammable , easily damaged or sensitive to deterioration . <br /> D . Deliver products to the site in manufacturer's original sealed containers or other packing <br /> systems , complete with instructions for handling , storing , unpacking , protecting and installing . <br /> E . All items delivered to the site shall be unloaded and placed in a manner, which will not <br /> hamper the Contractor's normal construction operation or those of subcontractors and other <br /> contractors and will not interfere with the flow of necessary traffic . <br /> F. Provide necessary equipment and personnel to unload all items delivered to the site . <br /> G . Promptly inspect shipment to assure that products comply with requirements , quantities are <br /> correct , and items are undamaged . For items furnished by others (i . e . Owner, other <br /> Contractors ) , perform inspection in the presence of the Engineer. Notify Engineer verbally , <br /> and in writing , of any problems . <br /> 1 . 03 STORAGE AND PROTECTION <br /> A . Store and protect products in accordance with the manufacturer's instructions , with seals and <br /> labels intact and legible . Storage instruction shall be studied by the Contractor and reviewed <br /> with the engineer by him/her. Instruction shall be carefully followed and a written record of <br /> this kept by the Contractor. Arrange storage to permit access for inspection . <br /> B . Store loose granular materials on solid flat surfaces in a well -drained area . Prevent mixing <br /> with foreign matter. <br /> Page 25 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.