My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-154
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2016 2:48:37 PM
Creation date
9/30/2015 6:37:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/01/2003
Control Number
2003-154
Agenda Item Number
7.H.
Entity Name
TLC Engineering, Inc.
Subject
Douglass School Cafetorium HVAC upgrades
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3289
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`` ? 1 C -3 <br /> INDIAN RIVER COUNTY <br /> DOUGLAS CAFETERIA HVAC UPGRADES H <br /> AGREEMENT 4 <br /> THIS AGREEMENT made and entered into this 1st day of Jul y , 20 03 , <br /> by and between TLC Engineering, Inc. 874 Dixon Boulevard Cocoa, Florida 32922 -5809 hereinafter <br /> called the ENGINEER and INDIAN RIVER COUNTY herein called the OWNER. <br /> WITNESSED : That whereas , the OWNER and the ENGINEER for the consideration hereinafter named, <br /> agree as set forth below : <br /> Article 1 . SCOPE OF WORK <br /> The existing building shall be outfitted with a proposed packaged air-conditioning unit at the rear of the <br /> building . This project includes the installation of new air conditioners , ductwork and electrical support . <br /> Construction Administration services shall be provided for the construction period and is included in this <br /> price . <br /> The project design shall consist of mechanical and electrical work for the installation of two air- <br /> conditioners (Trane base of design ) , new ductwork , as well as modification to the existing insulation. <br /> The design work shall include, but not be limited to the following : <br /> Removal of existing walls , etc and miscellaneous demolition <br /> Installation of the new A/ C units , ductwork, grilles <br /> New concrete pads for A/C units <br /> Modification of existing electrical service as necessary to accommodate the new A/C units <br /> Modifications to the existing lights within this facility <br /> Construction Administration shall include, but not be limited to the following : <br /> Bid negotiations <br /> Shop drawing review <br /> Responses to RFI ' s <br /> Pay request review <br /> Construction inspections <br /> Submittals : <br /> All work will on AutoCAD (2000) generated drawings <br /> Written specifications will provided on the drawings <br /> TLC will submit, For bidding purposes , 6 sets of final blueline drawings and specifications of the <br /> of proposed Division 15 and 16 work . <br /> Two (2) sets of review check prints at approximately 75 % design ( 11 "x17"prints) . <br /> One ( 1 ) copy of all final drawings on electronic media (Auto CAD 2000) . <br /> Design Meetings <br /> One meeting at the 75 % design phase is included. <br />
The URL can be used to link to this page
Your browser does not support the video tag.