Laserfiche WebLink
Fee Breakdown Attachment A <br /> Project Name: Improvements on 53rd Street 8 Old Dixie Highway Dunkelberger Engineering & Testing, Inc. <br /> Client: Indian River County 607 NW Commodity Cove <br /> DET Project No. PSL-08-2558 (BG 11 .4) Port St. Lucie, Florida 34986 <br /> Date: 8/29/2008 (772) 343-9787 FAX (772 343-9404 Contact: Chris L. Mings, P, E.. <br /> Geotechnical Services Contract Amount Progress Invoice Procarens Invoice Total To Date Remain rig on Contract <br /> Itemized Services r630 <br /> Unit Price Amount Qty Amount Q Amount Q Amount Qty Amount <br /> 1. Field Ex (oration <br /> Mobilization' EA , $350;00 : $350.00 0 $8:80 0 $880 8 $0.00 1 $350.00 <br /> Auger Borings" LF $925 $1 ' 387.50 0 6&00 0 5680 0 $880 150 $1 ,387.50 <br /> SPT Boris s: 0 - 50 ft.*** LF $ 12.00 $7 560.00 0 $0:00 0 $13:90 8 $0:90 630 $7,560.00 <br /> Grout LF $4.00 32,280:00 8 $080 9 $0:80 0 $6,00 570 52,280:00 <br /> Thirrwalled Tube Sam les EA $100.00 $200.00 0 $070 0 $0.00 ti $0-.00 2 $200.00 <br /> Borehole Permeability"** 21 EA $350:00 $700.00 9 $0-90 0 $6-00 0 $0:00 2 $700.00 <br /> Temp. Piez.: <12 ft.'*' 50 LF $25.00 $1 ,250.00 9 $8:08 0 $0-00 0 $880 50 $1 ,250.00 <br /> Ground Penetrating Radar 1 LS $3920:00 $3.920.00 8 $888 0 $0:80 0 $608 1 $34920.00 <br /> Maintenance of Traffic 3 DAY $1D0`.00 $300.00 8 : 0 $8.89 0 50:00 3 $300.00 <br /> Sr. Engineering Tech***** 32 HR $50.06 $1;600.00 0 $0 00 0 $680 0 X08 32 $1 ,600.00 <br /> Project Engineer"""** 8 HR $95.00 $760.00 6 $0:09 8 $0:00 0 $9 09 8 $760.00 <br /> Subtotal $20,307.50 $0:80 $9:80 $088 $20,307.50 <br /> " Mobilization with an AN-mounted drill rig: <br /> '* 25 auger borings @ 6' deep. <br /> "* 10 SPT borings @ 20' deep between lakes, 2 @:20' in wet pond,, 2 @ 104 in dry pond, 10 @35' for mastarms. <br /> 1 field borehole permeability test per dry pond. <br /> '**•* 3 @ 6' deep along roadway and 4 @ 20' in ponds. <br /> *•*" field work coordination, baring layout, utility clearance, site reconnaissance, and piezometer measurements <br /> observe test pit excavations <br /> It, Laboratory:Testis <br /> Visual Classification 7 HR $95.00 $665.00 8 $000 0 $000 0 $9:00 7 $665.00 <br /> Sieve Analysis 9 EA $45.00 $405.00 8 $0:00 0 $0:80 0 $0:90 9 5405.00 <br /> Organic Content 6 EA $30.00 $ 180.00 0 $0.00 0 $0700 8 50__88 6 $180.00 <br /> Percent Fines 14 EA $30.00 $420.00 0 $0.00 8 $0:08 0 5888 14 $420 .00 <br /> Moisture Content 30 EA $10.00 $300.00 0 $080 0 $0:00 8 $090 30 S300A0 <br /> Corrosion Series 6 EA $150.00 $900.00 0 $880 0 $8690 9 $000 6 $900.00 <br /> LBR Tests 2 EA $300.00 $600.00 0 $Q-W 0 $088 $ $089 2 $600.00 <br /> Consolidation Tests 1 EA $375.00 $375:00 8 $898 0 $888 0 $0 90 1 $375.00 <br /> Liquid Limit of Soils 9 EA $45:00 $405, 0 $9:06 8 $0 80 8 $889 9 -$405.00 <br /> Plastic Limit of Soils 9 EA $45.00 $405.00 8 $800 8 $008 A $809 9 $405.00 <br /> Subtotal' $4,655.00 $ei08 $8-00' $680 $4;655.00 <br /> Ill. <br /> Engineering & <br /> Re ' orris <br /> Principal Engineer 6 HR` $145.00 $870,00 0 $8:09 6 $680 0 ' $9:00 60.00 <br /> Sr. Geotech. Engineer 30 HR. $120.00 $3,600.00 0 $9:00 0 0 $0:00 300:00 <br /> ProiectEngineer 60 HR. $95.00 $5.700.00 0 50-00 0 $000 0 $0:88 600:00 <br /> CADD 16 HR $50.00 $800.00 8 $A 89 0 _ so-W 0 $680 160.00 <br /> Word Processor 16 HR $40.00 $640.00 8 $0:89 A $0:80 9 $0:98 16P$66040-00 <br /> Subtotal $11 ,610.00 $0:00 $0=00 $800 $11 ;610.00 <br /> Estimated Total $36,572.50 $880 $680 $8:90 $36,572.50 <br /> ESTIMATED MAXIMUM FEE OF: $36,572.50 <br />