My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-275
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2016 9:54:32 AM
Creation date
10/1/2015 12:33:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/09/2008
Control Number
2008-275
Agenda Item Number
8.W.
Entity Name
Dunkelberger Engineering & Testing
Subject
Work Order No.7 53rd Street Roadway Improvements
Area
53rd Street
Project Number
0107
Supplemental fields
SmeadsoftID
7553
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fee Breakdown Attachment A <br /> Project Name: Improvements on 53rd Street 8 Old Dixie Highway Dunkelberger Engineering & Testing, Inc. <br /> Client: Indian River County 607 NW Commodity Cove <br /> DET Project No. PSL-08-2558 (BG 11 .4) Port St. Lucie, Florida 34986 <br /> Date: 8/29/2008 (772) 343-9787 FAX (772 343-9404 Contact: Chris L. Mings, P, E.. <br /> Geotechnical Services Contract Amount Progress Invoice Procarens Invoice Total To Date Remain rig on Contract <br /> Itemized Services r630 <br /> Unit Price Amount Qty Amount Q Amount Q Amount Qty Amount <br /> 1. Field Ex (oration <br /> Mobilization' EA , $350;00 : $350.00 0 $8:80 0 $880 8 $0.00 1 $350.00 <br /> Auger Borings" LF $925 $1 ' 387.50 0 6&00 0 5680 0 $880 150 $1 ,387.50 <br /> SPT Boris s: 0 - 50 ft.*** LF $ 12.00 $7 560.00 0 $0:00 0 $13:90 8 $0:90 630 $7,560.00 <br /> Grout LF $4.00 32,280:00 8 $080 9 $0:80 0 $6,00 570 52,280:00 <br /> Thirrwalled Tube Sam les EA $100.00 $200.00 0 $070 0 $0.00 ti $0-.00 2 $200.00 <br /> Borehole Permeability"** 21 EA $350:00 $700.00 9 $0-90 0 $6-00 0 $0:00 2 $700.00 <br /> Temp. Piez.: <12 ft.'*' 50 LF $25.00 $1 ,250.00 9 $8:08 0 $0-00 0 $880 50 $1 ,250.00 <br /> Ground Penetrating Radar 1 LS $3920:00 $3.920.00 8 $888 0 $0:80 0 $608 1 $34920.00 <br /> Maintenance of Traffic 3 DAY $1D0`.00 $300.00 8 : 0 $8.89 0 50:00 3 $300.00 <br /> Sr. Engineering Tech***** 32 HR $50.06 $1;600.00 0 $0 00 0 $680 0 X08 32 $1 ,600.00 <br /> Project Engineer"""** 8 HR $95.00 $760.00 6 $0:09 8 $0:00 0 $9 09 8 $760.00 <br /> Subtotal $20,307.50 $0:80 $9:80 $088 $20,307.50 <br /> " Mobilization with an AN-mounted drill rig: <br /> '* 25 auger borings @ 6' deep. <br /> "* 10 SPT borings @ 20' deep between lakes, 2 @:20' in wet pond,, 2 @ 104 in dry pond, 10 @35' for mastarms. <br /> 1 field borehole permeability test per dry pond. <br /> '**•* 3 @ 6' deep along roadway and 4 @ 20' in ponds. <br /> *•*" field work coordination, baring layout, utility clearance, site reconnaissance, and piezometer measurements <br /> observe test pit excavations <br /> It, Laboratory:Testis <br /> Visual Classification 7 HR $95.00 $665.00 8 $000 0 $000 0 $9:00 7 $665.00 <br /> Sieve Analysis 9 EA $45.00 $405.00 8 $0:00 0 $0:80 0 $0:90 9 5405.00 <br /> Organic Content 6 EA $30.00 $ 180.00 0 $0.00 0 $0700 8 50__88 6 $180.00 <br /> Percent Fines 14 EA $30.00 $420.00 0 $0.00 8 $0:08 0 5888 14 $420 .00 <br /> Moisture Content 30 EA $10.00 $300.00 0 $080 0 $0:00 8 $090 30 S300A0 <br /> Corrosion Series 6 EA $150.00 $900.00 0 $880 0 $8690 9 $000 6 $900.00 <br /> LBR Tests 2 EA $300.00 $600.00 0 $Q-W 0 $088 $ $089 2 $600.00 <br /> Consolidation Tests 1 EA $375.00 $375:00 8 $898 0 $888 0 $0 90 1 $375.00 <br /> Liquid Limit of Soils 9 EA $45:00 $405, 0 $9:06 8 $0 80 8 $889 9 -$405.00 <br /> Plastic Limit of Soils 9 EA $45.00 $405.00 8 $800 8 $008 A $809 9 $405.00 <br /> Subtotal' $4,655.00 $ei08 $8-00' $680 $4;655.00 <br /> Ill. <br /> Engineering & <br /> Re ' orris <br /> Principal Engineer 6 HR` $145.00 $870,00 0 $8:09 6 $680 0 ' $9:00 60.00 <br /> Sr. Geotech. Engineer 30 HR. $120.00 $3,600.00 0 $9:00 0 0 $0:00 300:00 <br /> ProiectEngineer 60 HR. $95.00 $5.700.00 0 50-00 0 $000 0 $0:88 600:00 <br /> CADD 16 HR $50.00 $800.00 8 $A 89 0 _ so-W 0 $680 160.00 <br /> Word Processor 16 HR $40.00 $640.00 8 $0:89 A $0:80 9 $0:98 16P$66040-00 <br /> Subtotal $11 ,610.00 $0:00 $0=00 $800 $11 ;610.00 <br /> Estimated Total $36,572.50 $880 $680 $8:90 $36,572.50 <br /> ESTIMATED MAXIMUM FEE OF: $36,572.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.