Laserfiche WebLink
Proposal No . 03 - 10 - 1222 Appendix B <br /> BUDGETARY COST ESTIMATE <br /> Oslo Road and 43rd Avenue <br /> Indian River County, Florida <br /> Revised August 27, 2003 <br /> I. Test Pile Installations <br /> A . DE&T Project Engineer - pile driving inspection <br /> Estimate 1 day @ 8 hours/day @ $ 82 . 50/hr. $ 660 . 00 <br /> B . PDA Field Testing of 2 test piles , CAPWAP analysis and <br /> summary report by GRL 2 , 875 . 00 * <br /> C . Production Pile Lengths and Driving Criteria Evaluation <br /> and Reports <br /> Estimate 8 hours (Registered Professional Engineer) <br /> @ $ 98 . 00/hour 784 . 00 <br /> Subtotal I Test Pile Installations: $4 ,319 . 00 <br /> * At cost plus 15 % <br /> II . Production Pile Installations <br /> A. Project Engineer - coordination, oversight and report <br /> preparation <br /> Estimate 8 hours @ $ 82 . 50/hour $ 660 . 00 <br /> Subtotal II - Production Pile Installations: $ 660. 00 <br /> III. Precast Yard Inspections <br /> A. Precast Inspector <br /> Estimate 24 hours @ $ 57 . 00/hour $ 15368 . 00 <br /> B . Senior Engineer <br /> Estimate 4 hours @ $ 98 . 00/hour 392 . 00 <br /> Subtotal III - Precast Yard Inspections: $ 19760. 00 <br /> Estimated Total (Bridge Structure) : $69739 . 00 <br /> DE &T Page 1 of <br /> 1222bgt.rev . 1 <br />