My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-055
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 2:23:05 PM
Creation date
10/1/2015 3:17:47 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/03/2009
Control Number
2009-055
Agenda Item Number
8.R.
Entity Name
Dunkelberger Engineering & Testing
Subject
5th Street SW Bridge Replacement 43rd Ave Improvements
Work Order No.1
Area
5th St. SW
Project Number
0206
Supplemental fields
SmeadsoftID
10470
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Project # 0206XHIBI " Page 3 <br /> Project No . PSL- 07 - 2558 ( BG 10 . 6 ) 0 <br /> • Submittal of brief engineering reports documenting our findings and test results . <br /> The previous summarizes the typical testing services anticipated for the project . Dunkelberger <br /> can provide a complete range of construction services , including turbidity monitoring, vibration <br /> monitoring and specialty work , if needed . We understand that during the test pile program and <br /> the production pile installation the pile driving analyses and inspection will be performed by <br /> Bridge Design Associates, Inc . <br /> Our construction materials testing services will be provided on an as -needed basis as dictated by <br /> the pace and methods of construction . For scheduling purposes, we normally request at least 24 <br /> hours notice prior to the time the field services are needed . <br /> TERMS AND PAYMENT <br /> We propose to bill this work on a unit rate basis in accordance with our current <br />2008-2019 <br /> Continuing Geotechnical Seitvices Agreeinent. Based on the described scope of work and testing <br /> frequencies , we have provided an Estiniated Scope and Budget (Attachment A) for the required <br /> services and established a budget of $19, 994. Attachment B is our Project Data Sheet. <br /> 000 <br /> Dunkelberger Engineering & Testing, Inc . appreciates the opportunity to submit this proposal <br /> and looks forward to rendering the services described herein . Should you accept this proposal , <br /> we understand this work would be perfornred under a purchase order issued by Indian River <br /> County . To ensure proper distribution of our test reports, please complete the Pi4oject Data Sheet <br /> and return it to our Pont St . Lucie office . Should you have any questions concerning the <br /> contents , please feel free to call either of the undersigned . <br /> If we can answer any questions , please give us a call . <br /> Very truly yours , <br /> DUNKELBERGER ENGINEERING & TESTING , INC . <br /> David T . Youngstr Cr E . Dunkelberger, P . . <br /> Senior Project Mar ag r Vice President <br /> 2558 ( 10 ,6). phr <br /> Attachments : A -- Estimated Scope and Budget <br /> B — Project Data Sheet <br /> Uunketberaer <br />
The URL can be used to link to this page
Your browser does not support the video tag.