Laserfiche WebLink
D U N K S i, B E R G E R • Fort Lauderdale <br /> • Lakeland <br /> engineering & testing , ine . • Port Saint Lucie <br /> • Sarasota <br /> www. dunkelberger- engineering . com • West Palm Beach <br /> Indian River County March 12 , 2009 <br /> 1801 27"' Street Project No . PSL- 08 -2754 ( BG 11 . 1 ) <br /> Vero Beach , Florida 32960 <br /> Attention : Mr . Arjuna Weragoda , P . E. . . . via email <br /> Subject : Proposed Geotechnical Services ? W [, Lw .); <br /> Roadway Soil Survey and Structure Investigation <br /> Schumann Drive and Barber Street Intersection Improvements APR 1 4 2009 <br /> Indian River County , Florida <br /> INDIAN RI LINTY <br /> ENGINEE VISION <br /> Dear Mr . Weragoda : tit. C ' [� BY: .. ._._..._ ..e .. .._ . _ <br /> INTRODUCTION <br /> Dunkelberger Engineering & Testing , Inc . (Dunkelberger) is pleased to submit this proposal for <br /> the above referenced project . Our work scope is to complete a roadway soil survey and structure <br /> investigation generally following the guidelines outlined in the current FDOT Soils and <br /> Foundation Handbook (2006) . <br /> PROJECT CONSIDERATIONS <br /> The project will involve improvements to the Schumann Drive and Barber Street intersection in <br /> Indian River County , Florida . The Schumann Drive improvements will begin approximately <br /> 1 ,400 feet south of the intersection and extend to approximately 840 feet north of the <br /> intersection . The Barber Street improvements will begin approximately 960 feet west of the <br /> intersection and extend to approximately 660 feet east of the intersection . <br /> Please note that Dunkelberger previously provided geotechnical services for improvements to <br /> Schumann Drive south of the intersection as part our Roadway Soil Survey for the 66th Avenue <br /> Improvements . The scope of work outlined in this proposal includes supplemental exploration to <br /> evaluate an eastward shift to the roadway aligmnent in the 1 ,400 feet immediately south of the <br /> intersection . <br /> The following items will also be incorporated into the design of the intersection improvements : <br /> • Three pond sites are being considered . The existing pond at the southeast corner of the <br /> intersection will be enlarged. A new pond may be constructed on the west side of <br /> Schumann Drive, south of the intersection, where the alignment shifts to the east . <br /> Another pond may be constructed on County owned lots on the east side of Schumarm <br /> Drive approximately 400 feet south of the intersection. <br /> St� itrr of Flonrfu Hoard of llrotcsslonal F nyiriees Autliori / ripen No 0 £370 <br /> Toll - Free : ( 877) 643 - 6832 <br />