Laserfiche WebLink
Fee Breakdown Attachment A <br /> Geotechnical Services <br /> Roadway Soil Survey and Structure Investigation <br /> Project Name : Improvements on Schumann Drive and Barber Street Dunkelberger Engineering & Testing , Inc. <br /> Indian River County , Florida 607 NW Commodity Cove <br /> Client: Indian River County Port St. Lucie , Florida 34986 <br /> Dunkelberger Project No. : PSL-08-2754 ( BG 11 . 1 ) <br /> March 12 , 2009 (772 ) 343-9787 FAX (772) 343-9404 Contact: Chris L. Mings , P . E . <br /> Date : <br /> Geotechnical Services Contract Amount g Tot;; ' To Bate Remaining on Contract <br /> Qty Unit Price Amount Qty Arneuet Qty Aaaetat Qty Aaiet Qty Amount <br /> 1. Field Exploration1 $350 . 00 <br /> Drilll Rig Mobilization 1 EA $350. 00 $350 . 00 8 $0-00 0 $8-99 0 $9-90 <br /> Auger Borings* 96 LF $9 . 25 $888 . 00 0 $9-99 0 $9-99 96 $888 . 00 <br /> SPT borings** 180 LF $ 12 . 00 $2 , 160 . 00 9 $9-G9 9 $9-99 9 $0:89 180 $2 , 160 <br />. 00 <br /> Grout seal boreholes 180 LF $4 . 00 $720 . 00 9 $0-00 8 $0-00 8 $9 9G 180 $720 <br />. 00 <br /> Piezometer Installation*** 54 LF $25 . 00 $ 1 , 350 . 00 9 $9 89 8 $G 99 8 $9 09 54 $ <br />1 , 350 . 00 <br /> Field Permeability Tests 3 EA $350 . 00 $ 17050 . 00 0 $0-00 0 $9891 G $G-00 3 $ 1 , <br />050. 00 <br /> Sr. Eng . Technician**** 24 HR $55 . 00 $ 1 , 320 . 00 8 $8 99 8 $8 9G 8 $G 98 24 $ <br />1 , 320 . 00 <br /> Maint. of Traffic ( MOT) 4 DAY $ 115. 001 $460 . 00 0 $9-N 9 $9 99 0 $0-90 4 $460 . <br />00 <br /> Subtotal $8, 298.00 $0:00 $0:00 $000 $8, 298 .00 <br /> * 16 auger borings at 6 feet deep in staggered side-to-side pattern @ 250 ft. spacing along roadways . <br /> ** 2 SPT borings at 25 ft. deep for headwall replacement, 3 UZO 20 ft. deep for ponds , 2 @ 35 ft. deep for mast <br /> arm foundations . <br /> *** 4 piezometers @ 6 ft. deep along roadways and 3 @ 10 ft. deep in pond areas . <br /> **** Coordination of utility clearance and field drilling , stake boring locations , and measure groundwater levels in piezometers (2 Trips). <br /> 11, Laboratory Testing 4 $380 . 00 <br /> Project Engineer* 4 HR $95. 00 $380 . 00 0 $0-09 0 $8-90 0 $9-Ge <br /> Particle-size Analysis 12 EA $45 . 00 $540 . 00 0 $0-09 9 $0-00 9 12 $540. 00 <br /> $9 G9 <br /> Percent Fines 6 EA $30 . 00 $ 180 . 00 0 $0-00 0 $9-90 9 $G-00 6 $ 180 . 00 <br /> Liquid Limit of soils 3 EA $45 . 00 $ 135. 00 9 $0-00 8 $G-00 8 $G 99 3 $ 135 . 00 <br /> Plastic Limit of soils 3 EA $45 . 00 $ 135 . 00 8 $9 G9 9 $G 99 9 $9-00 3 $ <br />135. 00 <br /> Corrosivity Testing** 2 EA $ 150 . 00 $300 . 00 9 $0 0G 0 $G-G9 8 $0-09 2 $300 . 00 <br /> LBR Testing 2 EA $300 . 00 $600 . 00 0 $G-90 8 $9 G9 2 $600 . 00 <br /> Organic Content 2 EA $30 . 00 $60 . 00 8 $0 8G 9 $9.0G 9 $8 90 2 $60 . 00 <br /> Subtotal $29330 . 00 $0:00 $0.00 $0:00 $2, 330 . 00 <br /> * Visual -manual classification of recovered soil samples , assignment and review of laboratory testing . <br /> ** Corrosion series testing ( pH , sulfates, chlorides and resistivity) on 1 soil sample and 1 surface water sample. <br /> 111. Engineering & <br /> Reporting 0 $0--00 0 $0..88 8 $960 . 00 <br /> Reg . Professional Engineer 8 HR $ 120. 00 $960 . 00 8 $9 9G 40 $3 , 800 . 00 <br /> Project Engineer 40 HR $95 . 00 $3 , 800 . 00 0 $0-00 9 $0-00 9 $0-90 <br /> CADD 6 HR $50 . 00 $300. 00 0 $8-G0 9 $0-00 9 $0-09 61 <br /> $300 . 00 <br /> Administrative/Clerical 4 HR $45 . 00 $ 180. 00 0 $0.00 8 $0-9G 8 $9-GG 4 $ 180. 00 <br /> Subtotal $51240 . 00 $0:00 $0:00 $0:00 $59240 . 00 <br /> Estimated Total $ 15 , 868 . 00 $0:00 $0MG01 somool $ 15 , 868 . 00 <br /> SAY, LUMP SUM FEE OF: $ 15, 868 <br /> Revised - Dunkelberger Fee [breakdown <br />