My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-100
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2016 10:21:13 AM
Creation date
10/1/2015 12:03:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/08/2008
Control Number
2008-100
Agenda Item Number
8.N.
Entity Name
Dunkelberger Engineering
Subject
Work Order No.3 Oslo Boat Ramp improvements
Area
Oslo Road
Project Number
0381
Supplemental fields
SmeadsoftID
6947
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WO# 3 <br /> Oslo Road and Oslo Road Boat Ramp Improvements <br /> IRC Project No. 0381 <br /> 9. Baseline turbidity readings will be obtained in Indian River Lagoon adjacent to the <br /> boat ramp and in the existing wet ditch on the south side of the road. <br /> MOT will be according to FDOT Design Standards 602 for the boring locations that falls within <br /> 15 feet from the edge of the road . <br /> Laboratory Testing <br /> 1 . Laboratory examination (classification) of the soil samples and physical property <br /> tests of same to establish their plasticity, gradation , organic content, moisture <br /> content and LBR. <br /> Reporting <br /> 1 . Preparation and submittal of a Roadway Soil Survey Report in general accordance <br /> with Chapter 9 of FDOT's Soils and Foundation Handbook (2006). The report will <br /> address plastic or unsuitable soils (limits and volume) , if present, projected water <br /> table levels , and design/construction options to deal with potential plastic soils and <br /> perched water (e.g . , medians) . The report will include drafted cross-sectional <br /> profiles of the subsurface conditions with AASHTO soil classifications. <br /> 2 . Pile capacity graphs will be provided for the timber piles that will be used to support <br /> the access ramps and fishing piers. Dunkelberger will require nominal diameter of <br /> the piles , design scour depth and design capacity of these piles to determine the <br /> minimum length of the piles . <br /> All work shall also comply with the current Florida Minimum Technical Standards. <br /> COMPENSATION . <br /> The COUNTY agrees to pay, and the Geotechnical Professional agrees to accept, a fee for <br /> services rendered according to the "Scope of Services" identified in the attached EXHIBIT 'W' <br /> Fee Schedule and Man Hours. <br /> A Not-to-Exceed Amount of: $ 12.489 . 50 to be paid on a unit price basis for actual work <br /> performed in accordance with the schedule of services and fees set forth in Exhibit A of <br /> RENEWAL OF THE ANNUAL GEOTECHNICAL SERVICES CONTRACT IRC PROJECT NO. <br /> 0534 WITH DUNKELBERGER EGINEERING & TESTING INC . Effective Date: October 1 , <br /> 2005. <br /> TIME FOR COMPLETION <br /> Following receipt of the written authorization to proceed , the estimated schedule for the <br /> geotechnical work will be as follows: <br /> • Project start-up, boring layout and utility clearance and Field Exploration — 1 to 2 Weeks <br /> • Laboratory testing — 2 weeks <br /> Engineering analysis, preparation and submittal of draft report — 1 to 2 weeks <br /> • Finalize report - 1 week <br /> SCHEDULE TOTAL: 5 to 7 weeks <br /> F :Tngineering\Capital Projects\0381 Oslo Road Boat Ramp\Agenda's & Contracts\0381 Oslo Boat Ramp WOd 3 Dunkelberger 03-25-08.doc <br />