Laserfiche WebLink
attachment; and a 10" deep reinforced 500 micron Nitrex nylon net. ( One <br /> supplier is Forestry Supplies , Inc. Catalog 54 #77921 . Telephone 1 -800= <br /> 647-5368 . ) <br /> d . Marsh-McBirney, Inc. Flo-Mate Model 2000- 11 battery powered velocity <br /> meter. (Telephone 1 -800=368-2723 . ) <br /> e . Sony Model CD Mavica MVC-CD350 digital camera with carrying case . <br /> Item No . 8 — On Sheets 3 and 4 of the Drawings , the location of the proposed <br /> stormwater pipe and one or more drainage structures appears to be in conflict <br /> with the location of existing wood power poles and/or service poles . Rather than <br /> relocate the utility poles , we will field locate the drainage structures and pipe to <br /> avoid the poles to the best extent practicable , realizing that there is also a nearby <br /> 8-inch diameter PVC potable water main to contend with . The cost of working in <br /> the vicinity of existing utilities and protecting all existing utilities shall be included <br /> in the unit price of the pipe . <br /> Item No . 9 — Disregard Item No . 5 in Addendum No . 1 . The "Pipe Backfill Detail <br /> @ U . S . Hwy. No . 1 " on Sheet 8 of the Drawings shall be deleted and replaced <br /> with the attached detail , titled " Pipe Backfill Detail @ U . S . Hwy. No . 1 — Revised <br /> April 30 , 2003 . " The cost for all rock, sand , filter cloth , etc . shown in this revised <br /> detail shall be included in the unit price for the slotted ERCP . <br /> Item No . 10 — Note that there is a City of Vero Beach GIS monument ( Hade GPS <br /> ( 1009 ) Azimuth Monument) along 41st Street near the railroad right-of-way that <br /> may be destroyed or damaged by construction . This monument was flagged on <br /> April 29 , 2003 by Indian River County surveyors , but the County does not <br /> guarantee that the flags will remain until construction activities begin . The <br /> Contractor is responsible for replacing this survey monument and all other survey <br /> monuments or benchmarks that are destroyed or damaged as a result of its <br /> construction activities . Refer to Section 01050 , paragraph 1 . 3 . B . <br /> + + END OF ADDENDUM NO . 2 + + <br /> Addendum No . 2 = 3 EAST GIFFORD <br /> FAPublic WorksWeithmstormwater Projects\Gifford East\Construction ContrachBidding & Contract Documents\Bidding & <br /> Contract Documents\Hddendum #002.doc <br />