4 <br /> 1 Y <br /> Y 1 <br /> C . Item 1 . 03 - Project Record Documents : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation , <br /> including but not limited to , all labor, materials , and equipment required to <br /> prepare Project Record Documents , including survey work and AutoCad work. <br /> This bid item shall be paid in the final pay request and after the Record <br /> Documents have been approved by the ENGINEER. No partial payments for <br /> Project Record Documents shall be made . No additional paymentwill be made <br /> for revisions to Project Record Documents to make them comply with the <br /> contract requirements . <br /> D . Item 1 . 04 - Performance Bond : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for providing a Performance Bond as required by these Contract Documents . <br /> The total lump sum to be paid for this item shall not exceed one and one - <br /> half ( 1 . 5) percent of the total bid . Twenty-five (25) percent of the bid item <br /> amount may be paid in the first application for payment and the remaining <br /> seventy-five (75 ) percent of the bid item amount shall be paid in the last <br /> application for payment. <br /> E . Item 1 . 05 - Payment Bond : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for providing a Payment Bond as required by these Contract Documents . The <br /> total lump sum to be paid for this item shall not exceed one and one -half <br /> ( 1 . 5) percent of the total bid . Twenty-five (25 ) percent of the bid item amount <br /> may be paid in the first application for payment and the remaining seventy-five <br /> (75) percent of the bid item amount shall be paid in the last application for <br /> payment. <br /> F . Item 1 . 06 - Survey Work: <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation , <br /> including but not limited to , all labor, materials , and equipment required to <br /> establish and protect survey control points , replace disturbed or destroyed <br /> property monuments and survey control points , and perform construction <br /> staking . Twenty-five (25) percent of the bid item amount may be paid in the first <br /> application for payment, twenty-five (25) percent may be paid at approximately <br /> the one-half way point in the construction contract , and the remaining fifty (50 ) <br /> percent of the bid item amount shall be paid in the last application for payment. <br /> G . Item 1 . 07 — Project Photographs : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for photographic construction documentation as specified . Twenty-five (25 ) <br /> percent of the bid item amount may be paid in the first application for payment <br /> and the remaining seventy-five (75 ) percent of the bid item amount shall be <br /> Last revised 4/29/03 01025=3 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormvater Projects\Gifford East\Construction Contract\Technical Specifications\Final SpecificationsTivision <br /> 1 \01025 - Measurement and Paynent - Revised April 29, 2003.doc <br />