J
<br /> including but not limited to all labor, materials , equipment, connection ,
<br /> excavation , dewatering , grout , fittings and appurtenances , backfill , compaction
<br /> and final grading .
<br /> Z . Item 5 . 04 — Clean Yellow Sand Berm :
<br /> 1 . Measurement and Payment: The lump sum payment will be full compensation
<br /> for constructing the clean yellow sand berm as shown on the Drawings ,
<br /> including but not limited to all labor, materials , equipment, transportation , yellow
<br /> sand , transportation , sieve analysis , placing , compaction and final grading .
<br /> AA . Item 5 . 05 — 8' High Chain Link Fence and 16 ' wide Double Swing Gate , with 3-
<br /> strand Barb Wire :
<br /> 1 . Measurement: The quantity of chain link fence and swing gate in-place , will be
<br /> the number of linear feet of fence furnished and installed as shown on the
<br /> Drawings .
<br /> 2 . Payment: The unit price per linear foot will be full compensation for all labor,
<br /> materials , tools and equipment required for a complete installation , including but
<br /> not limited to clearing and grubbing , grading , polyolefin elastomer coating , chain
<br /> link fence fabric , tension wire , barbed wire , barbed wire attachments , line posts ,
<br /> corner posts , end posts , braces , truss rods , tie wires , swing gate ,
<br /> appurtenances , fittings , hardware , concrete , furnishing , installing , and site
<br /> restoration .
<br /> BB . Item 5 . 06 — Asphalt Pavement Repair at Road Crossings :
<br /> 1 . Measurement and Payment: The lump sum payment will be full compensation
<br /> for restoring the roads in accordance with the Construction Drawings and
<br /> Specifications , and as directed bythe ENGINEER . The lump sum paymentwill
<br /> be full compensation for furnishing all labor, materials and equipment including ,
<br /> but not limited to , saw cutting ; pavement removal and disposal , including
<br /> transportation and disposal fees , compaction ; permits ; limerock base ;
<br /> temporary asphalt seal coat surface , pavement markings ; repair or replacement
<br /> of damaged traffic signal devices and loops ; prime coat; tack coat; and Type S-
<br /> 1 asphaltic concrete for a complete patch .
<br /> CC . Item 5 . 07 - Remove Existing 29"x45" Mitered End :
<br /> 1 . Measurement and Payment: The lump sum payment will be full compensation
<br /> for all labor, materials , tools and equipment, including but not limited to removal
<br /> and disposal of existing mitered end ; clearing and grubbing , excavation ;
<br /> drainage and dewatering ; restoration ; backfill and compaction , protection of
<br /> existing utilities and structures ; and coordination for the relocation of existing
<br /> facilities by the OWNER or utility.
<br /> CC1 Item . 5 . 08 — Miscellaneous Stormwater Measuring and Recording Equipment :
<br /> Last revised 4/29/03 01025-8 EAST GIFFORD
<br /> R\Public WorksWeithmstormweter Projects\Efford East\Construction Contrac0echnical Specifications\Rnal Specificatlons\Division
<br /> 1 \01 025 = Measurement and Payment - Revised April 29, 2003.doc
<br />
|