Laserfiche WebLink
working outside the Limits of Construction shall be at no cost to the OWNER . <br /> HH , Item 6 . 06 — Seed and Mulch : <br /> I . Measurement: The quantity of seed and mulch will be the actual number of <br /> square yards seeded and mulched . <br /> 2 . Payment: The unit price for each square yard of seed and mulch will be full <br /> compensation for furnishing all labor, materials , and equipment for installation , <br /> including but not limited to , grading , seed , mulch , fertilizer, maintenance , and <br /> watering . Note : Payment for seed and mulch will only be made within the limits <br /> shown on the Drawings or specified . All other seed and mulch required due to <br /> the CONTRACTOR working outside the Limits of Construction shall be at no <br /> cost to the OWNER . <br /> ALTERNATIVE BID ITEMS <br /> II . Item 7 . 012 — Dispose Excess Topsoil and Excess Excavated Material at a site <br /> selected by the CONTRACTOR : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for hauling and stockpiling excess topsoil and excess excavated material . The <br /> lump sum payment includes , but is not limited to furnishing all labor, materials , <br /> tools and equipment, transportation and disposal . <br /> JJ . Item 7 . 021 — Provide equipment to spread and stockpile excess topsoil and excess <br /> excavated material at the Indian River County disposal site : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for spreading and stockpiling excess topsoil and excess excavated material . <br /> The lump sum payment includes , but is not limited to furnishing all labor, <br /> materials , tools and equipment, spreading , and stacking . <br /> KK . Item 7 . 03 - Selectively clear and grub ( per Section 02050 ) the Edward Berndt <br /> property immediately west of the proposed stormwater detention site , including <br /> permits , demolition , disposal , etc. : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for selective clearing and grubbing , including but not limited to , all labor, <br /> materials and equipment , stumping , obtain required permits , permit fees , <br /> removal of existing pipe , and disposal of debris . <br /> + + END OF SECTION + + <br /> Last revised 4/29/03 01025- 10 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormwater Projects\Gifford EashConstruction Contract\Technical Specifications\Final Specifications\Division <br /> 1 \01025 - Measurement and Paynent - Revised April 29, 2003.doc <br />