My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.1
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:51:24 PM
Creation date
9/30/2015 6:31:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.1
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 1 Bidding Documents, contract forms, and conditions of contract
Project Number
9219
Bid Number
5063
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K <br /> pufahase and maintain <br /> 2 . 05 Before Starting Construction fele-5: ^ <br /> A. CONTRACTOR 's Review of Contract Documents: Paragraph 2.06.A has been deleted and replaced with a <br /> Before undertaking each part of the Work, new paragraph. See the Supplementary Conditions. <br /> CONTRACTOR shall carefully study and compare the 2 .06 Preconstruction Conference <br /> Contract Documents and check and verify pertinent figures <br /> therein and all applicable field measurements. A. A idiin-20 days after- the Gent T ' 4 .. <br /> oaTa�xcc� axc-vvaacot : axxca otat t-tv <br /> CONTRACTOR shall promptly report in writing to nH4 bW before any Werk at the Site <br /> . ft a a eenfer-enee <br /> ENGINEER any conflict, error, ambiguity, or discrepancy attended-by GQNTRAG'€OPP , ENGPIEElt and eq}eFs as <br /> which CONTRACTOR may discover and shall obtain a <br /> written interpretation or clarification from ENGINEER ,n,deFstaadin.9 g the paF es as <br /> to the �x e& a <br /> 49 <br /> before proceeding with any Work affected thereby; diseuss the sehAda�es Fe er-ed to in para-mph 2 . 05i , <br /> ' however, CONTRACTOR shall not be liable to OWNER preeedums €er. handling—Saep lFe«4ags and ether <br /> or ENGINEER for failure to report any conflict, error, sabmWals, pmeessing—Appheatiens fOF Paymenh <br /> ambiguity, or discrepancy in the Contract Documents unless nmiatafiiingFequimd Feeefds . <br /> ' CONTRACTOR knew or reasonably should have known <br /> thereof. 2 .07 Initial Acceptance of Schedules <br /> B . Preliminary Schedules: Within ten days after the A. Unless otherwise provided in the Contract Docu- <br /> Effective Date of the Agreement (unless otherwise specified ments, at least ten days before submission of the <br />first <br /> in the General Requirements), CONTRACTOR shall Application for Payment a conference attended by CON- <br /> submit to ENGINEER for its timely review: TRACTOR, ENGINEER, and others as appropriate will be <br /> held to review for acceptability to ENGINEER as provided <br /> 1 . a preliminary progress schedule indicat- below the schedules submitted in accordance with <br /> ing the times (numbers of days or dates) for starting paragraph 2 .05 .B. CONTRACTOR shall have an <br /> and completing the various stages of the Work, additional ten days to make corrections and adjustments and <br /> ' including any Milestones specified in the Contract to complete and resubmit the schedules. No progress <br /> Documents; payment shall be made to CONTRACTOR until acceptable <br /> schedules are submitted to ENGINEER. <br /> ' 2 , a preliminary schedule of Shop Drawing <br /> and Sample submittals which will list each required 1 . The progress schedule will be acceptable <br /> submittal and the times for submitting, reviewing, to ENGINEER if it provides an orderly progression <br /> and processing such submittal; and of the Work to completion within any specified <br /> Milestones and the Contract Times. Such accep- <br /> 3 , a preliminary schedule of values for all of tance will not impose on ENGINEER responsibility <br /> the Work which includes quantities and prices of for the progress schedule, for sequencing, schedul- <br /> items which when added together equal the Contract ing, or progress of the Work nor interfere with or <br /> Price and subdivides the Work into component parts relieve CONTRACTOR from CONTRACTOR's <br /> in sufficient detail to serve as the basis for progress full responsibility therefor. <br /> payments during performance of the Work. Such <br /> ' prices will include an appropriate amount of 2. CONTRACTOR's schedule of Shop <br /> overhead and profit applicable to each item of Drawing and Sample submittals will be acceptable <br /> Work. to ENGINEER if it provides a workable <br /> arrangement for reviewing and processing the <br /> Paragraph 2.05.0 has been deleted and replaced with a required submittals. <br /> new paragraph. See the Supplementary Conditions. <br /> G. Bvidenee-ef In;uranee= Before any Wefk at-the 3 . CONTRACTOR' s schedule of values <br /> Site is ..«ta ted, GQR DAGTGR and QWMn ..i, n 1, will be acceptable to ENGINEER as to form and <br /> deliver- te the other-, with eopies to eaeh additional iasufed substance if it provides a reasonable allocation of the <br /> Contract Price to component parts of the Work. <br /> We (and other- e;4denee ef <br /> ' 00700 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.