My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.1
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:51:24 PM
Creation date
9/30/2015 6:31:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.1
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 1 Bidding Documents, contract forms, and conditions of contract
Project Number
9219
Bid Number
5063
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. such condition must meet any one or <br /> New Paragraphs 4.02.0 and 4.02.D have been added. more of the categories described in paragraph <br /> See the Supplementary Conditions. 4 .03 .A; and <br /> ' 4 . 03 Deering Subsurface or Physical Conditions b. with respect to Work that is paid for on a <br /> Unit Price Basis, any adjustment in Contract <br /> ' A. Notice: If CONTRACTOR believes that any Price will be subject to the provisions of para- <br /> subsurface or physical condition at or contiguous to the Site graphs 9.08 and 11 .03 , <br /> that is uncovered or revealed either: <br /> 2. CONTRACTOR shall not be entitled to <br /> 1 . is of such a nature as to establish that any any adjustment in the Contract Price or Contract <br /> "technical data" on which CONTRACTOR is Times if <br /> entitled to rely as provided in paragraph 4 .02 is <br /> materially inaccurate; or a. CONTRACTOR knew of the existence <br /> of such conditions at the time CONTRACTOR <br /> 2, is of such a nature as to require a change made a final commitment to OWNER in respect <br /> in the Contract Documents; or of Contract Price and Contract Times by the <br /> submission of a Bid or becoming bound under a <br /> 3 . differs materially from that shown or negotiated contract; or <br /> indicated in the Contract Documents; or <br /> b. the existence of such condition could <br /> 4. is of an unusual nature, and differs reasonably have been discovered or revealed as a <br /> materially from conditions ordinarily encountered result of any examination, investigation, explo- <br /> ' and generally recognized as inherent in work of the ration, test, or study of the Site and contiguous <br /> character provided for in the Contract Documents ; areas required by the Bidding Requirements or <br /> Contract Documents to be conducted by or for <br /> then CONTRACTOR shall, promptly after becoming aware CONTRACTOR prior to CONTRACTOR'S <br /> thereof and before further disturbing the subsurface or making such final commitment; or <br /> physical conditions or performing any Work in connection <br /> therewith (except in an emergency as required by paragraph c . CONTRACTOR failed to give the <br /> 6 . 16.A), notify OWNER and ENGINEER in writing about written notice within the time and as required by <br /> such condition. CONTRACTOR shall not further disturb paragraph 4.03 .A. <br /> such condition or perform any Work in connection <br /> therewith (except as aforesaid) until receipt of written order Part of the second sentence of Paragraph 4.03 .C.3 has <br /> to do so . been deleted. <br /> 3 . If OWNER and CONTRACTOR are <br /> B . ENGINEER 's Review: After receipt of written unable to agree on entitlement to or on the amount <br /> ' notice as required by paragraph 4.03 .A, ENGINEER will or extent, if any, of any adjustment in the Contract <br /> promptly review the pertinent condition, determine the Price or Contract Times, or both, a Claim may be <br /> necessity of OWNER's obtaining additional exploration or made therefor as provided in paragraph 10 .05 . <br /> tests with respect thereto, and advise OWNER in writing However, OWNER, ENGINEER, and <br /> (with a copy to CONTRACTOR) of ENGINEER's findings ENGINEER' s Consultants shall not be liable to <br /> and conclusions. CONTRACTOR for any claims, costs, losses, or <br /> damages (including but not limited to all fees and <br /> C. Possible Price and Times Adjustments charges of engineers, architects, attorneys, and other <br /> professionals and all court <br /> 1 . The Contract Price or the Contract dispute resolution costs) sustained by <br /> Times, or both, will be equitably adjusted to the CONTRACTOR on or in connection with any other <br /> ' extent that the existence of such differing subsurface project or anticipated project. <br /> or physical condition causes an increase or decrease <br /> in CONTRACTOR's cost of, or time required for, 4 . 04 Underground Facilities <br /> performance of the Work; subject, however, to the <br /> following: A. Shown or Indicated: The information and data <br /> shown or indicated in the Contract Documents with respect <br /> ' to existing Underground Facilities at or contiguous to the <br /> 00700 - 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.