My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.1
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:51:24 PM
Creation date
9/30/2015 6:31:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.1
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 1 Bidding Documents, contract forms, and conditions of contract
Project Number
9219
Bid Number
5063
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' graphs diFeugh ' 0 ' ^ 12 . 06 Delay Damages <br /> sive: <br /> Paragraphs 12.06.A and 12.06 B have been deleted and <br /> 12 . 02 Change of Contract Times replaced with a new paragraph. See the Supplementary <br /> Conditions. <br /> A. The Contract Times (or Milestones) may only be A. In no even. shag O";'*,TRD OF ENQNEER b <br /> changed by a Change Order or by a Written Amendment. , <br /> Any Claim for an adjustment in the Contract Times (or <br /> of any edwf per-son er- organization; of to "Y sur-ety fer- or- <br /> Milestones) shall be based on written notice submitted by empleyee of agent of y of theiF4 F a " " <br /> the party making the claim to the ENGINEER and the other of of resulting fiem <br /> party to the Contract in accordance with the provisions of <br /> paragraph 10.05 . }—heirs eausc�a by of m 'thi the een#el ef. <br /> B . Any adjustment of the Contract Times (or <br /> ' Milestones) covered by a Change Order or of any Claim for 2 , delays beyead —the—een#el of b <br /> an adjustment in the Contract Times (or Milestones) will be <br /> ' determined in accordance with the provisions of this hn4ted to fires, floods, epiderpies, <br /> Article 12 . eenditiens, aets ef Ged, OF a8tS OF neglea by <br /> eNN%er-s of other- eentmeter-s peFfeaning other- we <br /> 12 . 03 Delays Beyond CONTRACTOR 's Control as eentemplmed by ATfiele W . <br /> ' A. Where CONTRACTOR is prevented from B . Nothing in "s paragraph 12 . 06 bar-s a ehange in <br /> completing any part of the Work within the Contract Times <br /> (or Milestones) due to delay beyond the control of , 4Aegefeaee, <br /> CONTRACTOR, the Contract Times (or Milestones) will <br /> be extended in an amount equal to the time lost due to such . <br /> delay if a Claim is made therefor as provided in paragraph <br /> 12 .02 .A. Delays beyond the control of CONTRACTOR <br /> shall include, but not be limited to, acts or neglect by ARTICLE 13 - TESTS AND INSPECTIONS ; <br /> OWNER, acts or neglect of utility owners or other CORRECTION, REMOVAL OR ACCEPTANCE OF <br /> contractors performing other work as contemplated by DEFECTIVE WORK <br /> Article 7, fires, floods, epidemics, abnormal weather <br /> conditions, or acts of God. <br /> 13 .01 Notice of Defects <br /> 12 . 04 Delays Within CONTRACTOR 's Control <br /> A. Prompt notice of all defective Work of which <br /> A. The Contract Times (or Milestones) will not be OWNER or ENGINEER has actual knowledge will be <br /> extended due to delays within the control of given to CONTRACTOR. All defective Work may be <br /> CONTRACTOR. Delays attributable to and within the rejected, corrected, or accepted as provided in this <br /> control of a Subcontractor or Supplier shall be deemed to be Article 13 . <br /> ' delays within the control of CONTRACTOR <br /> 13 .02 Access to Work <br /> 12 .05 Delays Beyond OWNER 's and CONTRACTOR 's <br /> Control A. OWNER, ENGINEER, ENGINEER's Con- <br /> sultants, other representatives and personnel of OWNER, <br /> A. Where CONTRACTOR is prevented from independent testing laboratories, and governmental agencies <br /> completing any part of the Work within the Contract Times with jurisdictional interests will have access to the Site and <br /> ' (or Milestones) due to delay beyond the control of both the Work at reasonable times for their observation, <br /> OWNER and CONTRACTOR, an extension of the inspecting, and testing. CONTRACTOR shall provide <br /> Contract Times (or Milestones) in an amount equal to the them proper and safe conditions for such access and advise <br /> time lost due to such delay shall be CONTRACTOR's sole them of CONTRACTOR's Site safety procedures and <br /> ' and exclusive remedy for such delay. programs so that they may comply therewith as applicable . <br /> ' 00700 - 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.