My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.1
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:51:24 PM
Creation date
9/30/2015 6:31:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.1
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 1 Bidding Documents, contract forms, and conditions of contract
Project Number
9219
Bid Number
5063
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' will constitute a representation by ENGINEER to any examination to ascertain how or for what <br /> OWNER, based on ENGINEER's observations on purposes CONTRACTOR has used the moneys paid <br /> the Site of the executed Work as an experienced and on account of the Contract Price, or to determine <br /> qualified design professional and on ENGINEER's that title to any of the Work, materials, or equipment <br /> review of the Application for Payment and the has passed to OWNER free and clear of any Liens. <br /> accompanying data and schedules, that to the best of <br /> ENGINEER' s knowledge, information and belief: 5 . ENGINEER may refuse to recommend <br /> the whole or any part of any payment if, in <br /> a. the Work has progressed to the point ENGINEER' s opinion, it would be incorrect <br />to <br /> ' indicated; make the representations to OWNER referred to in <br /> paragraph 14.02.B .2 . ENGINEER may also refuse <br /> b. the quality of the Work is generally in to recommend any such payment or, because of <br /> accordance with the Contract Documents (sub- subsequently discovered evidence or the results of <br /> ' ject to an evaluation of the Work as a function- subsequent inspections or tests, revise or revoke any <br /> ing whole prior to or upon Substantial Comple- such payment recommendation previously made, to <br /> tion, to the results of any subsequent tests called such extent as may be necessary in ENGINEER's <br /> for in the Contract Documents, to a final deter- opinion to protect OWNER from loss because : <br /> mination of quantities and classifications for <br /> Unit Price Work under paragraph 9 .08 , and to a. the Work is defective, or completed <br /> any other qualifications stated in the Work has been damaged, requiring correction or <br /> recommendation) ; and replacement; <br /> c. the conditions precedent to b. the Contract Price has been reduced by <br /> ' CONTRACTOR' s being entitled to such pay- Written Amendment or Change Orders; <br /> ment appear to have been fulfilled in so far as it <br /> is ENGINEER's responsibility to observe the c. OWNER has been required to correct <br /> Work. defective Work or complete Work in accordance <br /> 1 3 . By recommending any such payment with paragraph 13 .09; or <br /> ENGINEER will not thereby be deemed to have d. ENGINEER has actual knowledge of the <br /> represented that: (i) inspections made to check the occurrence of any of the events enumerated in <br /> quality or the quantity of the Work as it has been paragraph 15 .02 .A. <br /> performed have been exhaustive, extended to every <br /> aspect of the Work in progress, or involved detailed New paragraphs 14.02.B.5.e and f have been added, <br /> inspections of the Work beyond the responsibilities See the Supplementary Conditions. <br /> specifically assigned to ENGINEER in the Contract <br /> Documents ; or (ii) that there may not be other Paragraph 14.02.C.1 has been deleted and replaced with <br /> ' matters or issues between the parties that might a new paragraph. See the Supplementary Conditions. <br /> entitle CONTRACTOR to be paid additionally by C. Payment Becomes Due <br /> OWNER or entitle OWNER to withhold payment to <br /> CONTRACTOR. 1 . T -ea days after presentation of the <br /> Appheatien €e: Payment to Q;W1 €+R with <br /> 4 . Neither ENGINEER's review of ENGOTEE _e e„ a t anieunt meem <br /> CONTRACTOR's Work for the purposes of recom <br /> ' mending payments nor ENGINEER's recommenda- , and YA4wn due vp2l be paid b <br /> tion of any payment, including final payment, will OVR4nn to GOINWR A CTO <br /> impose responsibility on ENGINEER to supervise, <br /> ' direct, or control the Work or for the means, meth- D. Reduction in Payment <br /> ods, techniques, sequences, or procedures of <br /> construction, or the safety precautions and programs 1 . OWNER may refuse to make payment of <br /> incident thereto, or for CONTRACTOR's failure to the full amount recommended by ENGINEER <br /> ' comply with Laws and Regulations applicable to because : <br /> CONTRACTOR' s performance of the Work <br /> Additionally, said review or recommendation will <br /> ' not impose responsibility on ENGINEER to make <br /> 00700 - 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.