My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.1
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:51:24 PM
Creation date
9/30/2015 6:31:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.1
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 1 Bidding Documents, contract forms, and conditions of contract
Project Number
9219
Bid Number
5063
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SC -2 . 06 Pre-Construction Conference <br /> SC-2 . 06 Delete paragraph GC-2. 06.A in its entirety and insert the following paragraph in its <br /> place: <br /> A. Immediately after awarding the contract, but before the CONTRACTOR begins <br /> work , the Engineer will call a pre-construction conference at a place the <br /> ENGINEER designates to establish an understanding among the parties as to <br /> the Work and to discuss schedules referred to in paragraph 2 . 05 . 13 , procedures <br /> for handling Shop Drawings and other submittals , and maintaining required <br /> records . Utility companies and others as appropriate will be requested to attend <br /> to discuss and coordinate work. <br /> SC -3 . 06 Coordination of Plans , Specifications , and Special Provisions <br /> SC-3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC-3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A. In case of discrepancy, the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 , Addenda <br /> 3 . Specifications <br /> 4 . Supplementary Conditions to the General Conditions <br /> 5 , General Conditions <br /> 6 . Approved Shop Drawings <br /> 7 . Drawings <br /> 8 , Referenced Standards , <br /> Be Written/computed dimensions shall govern over scaled dimensions . <br /> ' SC -4. 02 Subsurface and Physical Conditions <br /> ' SC-4 . 02 Add the following new paragraphs immediately after paragraph GC-4. 02. 8: <br /> C . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER's <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site : <br /> 1 . Report dated March 31 , 2000 , prepared by Fraser Engineering and Testing , <br /> Inc. , 3504 Industrial 33rd Street, Ft. Pierce , Florida 34946 , (772 ) 461 -7508 , <br /> ' entitled : Gifford Stormwater Improvements Project — Indian River County, <br /> Florida , FET Job#: 00183 , consisting of seven pages . <br /> D . Reports and drawings itemized in SC4 . 02 . 0 are not included with the Bidding <br /> Documents . Copies may be examined at Indian River County Public Works , 1708 <br /> 21st Street, Vero Beach , Florida , during regular business hours . These reports are <br /> not part of the Contract Documents . <br /> SC4. 03 Differing Subsurface or Physical Conditions <br /> SC-4 . 03 . C . 3 Delete the following text from the second sentence of paragraph GC-4- 03. C. 3: <br /> 00800 - Supplementary Conditions <br /> ' <br /> 008002 EAST GIFFORD <br /> FAPublic WorksWeithM\Storrrmater Projects\Gifford EashConstruction ContractOdding & Contract DocumentsOdding & Contract Documents\00800 - Supplementary <br /> Conditions.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.