My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.1
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:51:24 PM
Creation date
9/30/2015 6:31:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.1
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 1 Bidding Documents, contract forms, and conditions of contract
Project Number
9219
Bid Number
5063
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' A. In no event shall OWNER or ENGINEER be liable to CONTRACTOR, any <br /> Subcontractor, any Supplier, or any other person or organization , or to any surety <br /> for or employee or agent of any of them , for damages arising out of or resulting <br /> ' from any delay whatsoever. The CONTRACTOR's sole and exclusive remedy for <br /> delays to the project are time extensions . <br /> ' SC -13 . 03 Test and Inspections <br /> SC- 13 . 03 . 13 . Delete paragraph GC43. 03. 8 in its entirety, and insert the following in its place: <br /> Be OWNER shall employ and pay for the services of an independent testing <br /> laboratory to perform all initial inspections , tests , or approvals required by the <br /> ' Contract Documents except those inspections , tests , or approvals listed <br /> immediately below. Subsequent inspections , tests , or approvals required after <br /> initial failing inspections , tests , or approvals shall be paid for by the <br /> ' CONTRACTOR by backcharge to subsequent applications for payment. The <br /> CONTRACTOR shall arrange , obtain , and pay for the following inspections , <br /> tests , or approvals : <br /> 1 . inspections , tests , or approvals covered by paragraph 13 . 03 . D below; <br /> ' 2 , costs incurred in connection with tests or inspections conducted pursuant <br /> to paragraph 13 . 04 . 13 shall be paid as provided in said paragraph <br /> 13 . 04 . 13 ; <br /> 3 * tests otherwise specifically provided in the Contract Documents . <br /> SC- 13 . 03 . 0 Delete GC- 13. 03. 0 in its entirety. <br /> ' SC- 13 . 03 . Add the following paragraph immediately after paragraph GC43. 03. F.• <br /> ' G . The OWNER shall use the following testing laboratory: <br /> AM Engineering & Testing , Inc. <br /> Contact person = David Aucker <br /> Telephone number = (772 ) 567-6167 . <br /> SC -13 . 04 Uncovering Work <br /> ' SC- 13 . 04 . 13 Delete portions of the last two sentences as follows: <br /> If, however, such Work is not found to be defective , CONTRACTOR shall be allowed-an <br /> ' 5RGFease in the G9Rt. aGt PFiGe GF an extension of the Contract Times (or Milestones) ,-6F <br /> beth, directly attributable to such uncovering , exposure , observation , inspection , testing , <br /> replacement, and reconstruction . If the parties are unable to agree as to the-amsupt-ef <br /> ' extent thereof, CONTRACTOR may make a Claim therefor as provided in paragraph <br /> 10 . 05 . <br /> SC -13 . 05 OWNER May Stop the Work <br /> SC- 13 . 05 .A. Delete paragraph GC- 13. 05.A in its entire and insert the following paragraph in its <br /> entirety g P 9 P <br /> place: <br /> ! A. If the Work is defective , or CONTRACTOR fails to supply sufficient skilled <br /> workers or suitable materials or equipment, or fails to comply with permit <br /> ' requirements , or fails to comply with the technical specifications , or fails to <br /> perform the Work in such a way that the completed Work will conform to the <br /> 00800 - Supplementary Conditions <br /> 008009 EAST GIFFORD <br /> FAPublic WorksWedhKAStormwater Projects\Gifford East\Construction Contract\Bidding 8 Contract Documents\Bidding & Contract Documents\00800 - Supplementary <br /> Conditions.doc Rev. 05101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.