My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.1
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:51:24 PM
Creation date
9/30/2015 6:31:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.1
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 1 Bidding Documents, contract forms, and conditions of contract
Project Number
9219
Bid Number
5063
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3251
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> working outside the Limits of Construction shall be at no cost to the OWNER . <br /> HH , Item 6 . 06 — Seed and Mulch : <br /> 1 . Measurement : The quantity of seed and mulch will be the actual number of <br /> ' square yards seeded and mulched . <br /> 2 . Payment: The unit price for each square yard of seed and mulch will be full <br /> compensation for furnishing all labor, materials , and equipment for installation , <br /> ' including but not limited to , grading , seed , mulch , fertilizer, maintenance , and <br /> watering . Note : Payment for seed and mulch will only be made within the limits <br /> shown on the Drawings or specified . All other seed and mulch required due to <br /> ' the CONTRACTOR working outside the Limits of Construction shall be at no <br /> cost to the OWNER. <br /> ' ALTERNATIVE BID ITEMS <br /> II . Item 7 . 012 — Dispose Excess Topsoil and Excess Excavated Material at a site <br /> selected by the CONTRACTOR . <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> for hauling and stockpiling excess topsoil and excess excavated material . The <br /> lump sum payment includes , but is not limited to furnishing all labor, materials , <br /> tools and equipment , transportation and disposal . <br /> ' JJ . Item 7 . 021 — Provide equipment to spread and stockpile excess topsoil and excess <br /> excavated material at the Indian River County disposal site : <br /> 1 . Measurement and Payment: The lump sum payment will be full compensation <br /> ' for spreading and stockpiling excess topsoil and excess excavated material . <br /> The lump sum payment includes , but is not limited to furnishing all labor, <br /> materials , tools and equipment , spreading , and stacking . <br /> ' KK . Item 7 . 03 - Selectively clear and grub (per Section 02050 ) the Edward Berndt <br /> property immediately west of the proposed stormwater detention site , including <br /> ' permits , demolition , disposal , etc . . <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for selective clearing and grubbing , including but not limited to , all labor, <br /> ' materials and equipment , stumping , obtain required permits , permit fees , <br /> removal of existing pipe , and disposal of debris . <br /> ' + + END OF SECT)ON + + <br /> ' A <br /> Last revised 4/29/03 010� � 1 EAST GIFFORD <br /> FAPublic Works\KeithM\Storm%eter Projects\Gifford East\Construction Contract\Technicai Specifications\Rnal Specifications\Division <br /> ' 1 \01025 - Measurement and Paynent - Revised April 29, 2003.doc " <br />
The URL can be used to link to this page
Your browser does not support the video tag.