Laserfiche WebLink
SLUON -0000 - Bits BOND <br /> KNOW ALL MEN BY THESE PRESENTS, that we <br /> Dickerson Florida , Inc. (111005" nay <br /> as Prtnclpal, <br /> and Seaboard Surety Company <br /> (WROYs Miser <br /> a corporation duty oManizad under the Laws of the State of Florida as a Surety with its principal <br /> offices In the City of Baltimore, Maryiand and authorized to do bLWneae in the State of <br /> Florida, are held and firmly bound unto INDIAN RIVER COUNTY (hereinafter calved the <br /> OWNER) in the periW sum of five percent ( 5 % ) of theamount bid <br /> Dodtars ($ ) , lawful money of the United. States, <br /> amounting to 5% *(this total bid price, for the payment of which sum Ymn and truly be made, we <br /> � <br /> bind ourv+es, our heirs, maecutors , administratm, and successors, join lyand severally, firmly <br /> by these presents, <br /> Whereas said Principalis herewith submitting a Bid dated May 7 _. 2003, 110 <br /> for the construction ct <br /> Project Name: EAST GIFFORD STORMWATER IMPROVEMENTS <br /> County Project Number 9219 <br /> Project Address: The project is located south of 43"' Street, north of South Gifford <br /> Road (41 st Street), west of U . S. Highway 1 , and east of the Indian <br /> River Farms Water Control Otsirict. <br /> Project Description: Tire Contractorshall construct s stocmw;ater collection, conveyance, <br /> and detention system (6 * acre wet pond ) in a poorly drained area <br /> west of the Florida East Coast Raliroad track. It shall also construct . <br /> a stormweter collection and conveyance system in the western fight- <br /> of-way of U. S. Highway No. 1 . Stormwater runoff will drain into <br /> concrefe drainage structures and it will be conveyed by concrete <br /> pipe. The Work also includes a bore and Sack underneath the <br /> railroad track. The project is in the vicinity of the City of hero Beach <br /> Municipal Airport and it will . be regulated by the Federal Aviation <br /> Authority. Other perrrAling authorities inctude SL Johns River Water <br /> Managenuxit District. and the Florida Department of Transportation, <br /> NOW THI+REFORE, the condition & #m above obQgation is such . that if the Principal does not <br /> withdraw said Bid within the period of time set forth in the Bid Documents, and on or bebr¢ the <br /> fifteenth day after the ' Notice of Award, the Principle einem Into a written contract W M the <br /> OWNER In 2C= ance with the Bid as accepted, and ifthe Principal gives the required bonds <br /> With good and sulf1clent sureties for the faithful performance and proper fulfillment of such <br /> Contract and for the protection of laborers and materielmen (e.p, supptiars), then this obligation <br /> shall be null and void. Otherwise, the Principal and Surety, jointly and severally, shall on or <br /> b0fore the sWeth day after request by the OWNER, pay to the OWNER In money, the <br /> difference between the amount specified in said Bid and the amount for whtch the OWNER Inay <br /> 5104l01 BID BOND 004344 <br /> f'M'4Alic W0*AKsirf*A5WMw Ww ProlaelsWord E156CcM1rUd 1Qn ContacASIdding & contract Doc"nhrMdbV & Contract <br /> 0=Men&J0G4a0. 13rd Boftdoc <br /> 52 <br />