My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . Place 1 - 1 /2 inches of temporary bituminous pavement immediately after <br /> backfilling trenches in paved roadways which are to be retained for <br /> ' permanent use . Maintain the surface of the paved area over the trench in <br /> good and safe condition during progress of the entire Work , and promptly fill <br /> all depressions over and adjacent to the trench caused by settlement of <br /> ' backfilling . The permanent replacement pavement shall be equal to that of <br /> the existing roadways unless otherwise specified . <br /> 2 . All pavement, gutters , curbs , sidewalks or roadways disturbed or damaged <br /> ' by the CONTRACTOR'S operations , except areas designated " New <br /> Pavement" or " Proposed Pavement" , shall be restored by him at his own <br /> expense to as good condition as they were previous to the commencement <br /> of the Work and in accordance with applicable local and Florida Department <br /> of Transportation specifications . In the event of a conflict , the more <br /> stringent specification shall govern . <br /> ' B . All paved alleys and driveways of shell , limerock , stabilized soil or gravel , g rass <br /> plots , sod , shrubbery, ornamental trees , signs , fences , or other surface <br /> ' improvements on public or private property which have been damaged or <br /> removed in excavating shall be restored to conditions equal to or better than <br /> conditions existing prior to beginning work . Restoration of shoulders shall <br /> ' consist of sodding , seeding and mulching and/or stabilizing with limerock as <br /> determined by the OWNER . <br /> C . The cost of restoration shall be included in the cost of the various applicable <br /> items . <br /> ' 3 . 18 SETTLEMENT <br /> A . The CONTRACTOR shall repair at his expense , all damage caused by any <br /> ' settlement occurring within one year from the date of final acceptance by the <br /> OWNER . Make all repairs and replacements within 30 days after notice from <br /> ' ENGINEER or OWNER . <br /> + + END OF SECTION + + <br /> Last revised 9/10/022 - <br /> 02 20 21 EAST GIFFORD <br /> F:\Public Works\KeithM\stormmater Projects\Gifford East\construction contract\Technical Specifications\Fnai Specifications\Division <br /> ' 2\02220 - Excavation and Backfll.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.