Laserfiche WebLink
are no longer necessary (such time not to extend past the date the <br /> OWNER formally accepts the project as complete ) . <br /> ' B . Design , construct , and maintain the pollution control and treatment system <br /> to minimize erosion and capture and remove pollutants from the <br /> construction site and from all other areas disturbed by construction <br /> activities . <br /> + + END OF SECTION + + <br /> 1 <br /> Last revised 3/31 /03 02225=8 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormwater Projects\Gifford East\Construction ContrachTechnical Specifications\Final <br /> ' Specifications\Division 2\02225 - Erosion Control & Treatment.doc <br />