My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
site longer than two days without being laid . Water all sod within three days <br /> of being laid . <br /> ' 3 . Place the sod so that the entire area so indicated is covered with sod . Sod <br /> shall be brought in a neat , clean manner to the edge of all roads , bike path , <br /> sidewalk , shrub beds , etc . as indicated . <br /> ' 4 . Do not lay sod when weather and soil conditions are unsuitable for proper <br /> results . <br /> 5 . Place the sod on the prepared surface , with edges in close contact , and <br /> ' firmly and smoothly embed it by light tamping with appropriate tools . Where <br /> in the opinion of the ENGINEER , the sod has not been placed properly , roll <br /> the sodded area with a steel wheel roller weighing between 25 and 100 <br /> ' pounds per lineal foot . No power rolling will be permitted within 8 feet of any <br /> wall or structure . <br /> 6 . The sodded surface shall be smooth and free of gaps , holes , and uneven <br /> areas , etc . or it will not be accepted . If the OWNER or the ENGINEER <br /> determines that the sodded area is unacceptable , fill all gaps , holes , etc , with <br /> topsoil , re- roll , or relay the sod as applicable . No additional payment will be <br /> ' made for such work . <br /> 7 . Where new sod is laid adjacent to existing sod , the existing sod shall be <br /> trimmed on an even , straight line , and adjacent grading shall be such that <br /> finish grade of the new sod matches the existing grade of the existing sod . <br /> An uneven irregular finish at the interface of the new and existing sod will not <br /> be permitted . If the OWNER or ENGINEER find the interface work between <br /> the new and existing sod unacceptable , remove the new sod , re-trim the <br /> existing sod , regrade the area , and replace the new sod . No additional <br /> payment will be made for such work. <br /> 8 . Where sodding is used in drainage ditches , stagger the setting of the pieces <br /> to avoid a continuous seam along the line of flow. Along the edges of such <br /> staggered areas , the offsets of individual strips shall not exceed six inches . <br /> To prevent erosion caused by vertical edges at the outer limits , tamp the <br /> outer pieces of sod to produce a featheredge effect . <br /> 9 . On areas where the sod may slide due to height and slope , peg the sod with <br /> pegs driven through the sod blocks into firm earth , at suitable intervals . No <br /> additional payment will be made for sod that is placed on sloped surfaces , <br /> ' regardless of the degree of slope . <br /> 10 . Remove from the work , any pieces of sod that after placing , show an <br /> appearance of extreme dryness . <br /> ' 11 . Where existing sod is to be removed , maintained and re- installed , remove <br /> the existing sod with an appropriate sod cutter. Re- installation of the existing <br /> sod shall be as specified herein . <br /> ' 12 . When new sod is laid and the abutting property has existing sod , the new <br /> sod to be laid shall be the same type as the existing sod on the abutting <br /> property. <br /> Last revised 9/ 11 /02 02236-3 EAST GIFFORD <br /> F:\Public Works\KeithM\Stormeter ProjectslMord East\Construction Contract\Technical Specifications\nnal Specifications\Division <br /> 2\02236 - Sodding.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.