Laserfiche WebLink
2 . Payment: The unit price for each square and of seed an <br /> q Y d mulch will be full <br /> compensation for furnishing all labor, materials , and equipment for installation , <br /> ' including but not limited to , grading , seed , mulch , fertilizer, maintenance , and <br /> watering . Note : Payment for seed and mulch will only be made within the limits <br /> shown on the Drawings or specified . All other seed and mulch required due to <br /> ' the CONTRACTOR working outside the Limits of Construction shall be at no <br /> cost to the OWNER . <br /> ALTERNATIVE BID ITEMS <br /> II . Item 7 . 012 — Dispose Excess Topsoil and Excess Excavated Material at a site <br /> selected by the CONTRACTOR : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for hauling and stockpiling excess topsoil and excess excavated material . The <br /> ' lump sum payment includes , but is not limited to furnishing all labor, materials , <br /> tools and equipment, transportation and disposal . <br /> ' JJ . Item 7 . 021 — Provide equipment to spread and stockpile excess topsoil and excess <br /> excavated material at the Indian River County disposal site : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for spreading and stockpiling excess topsoil and excess excavated material . <br /> The lump sum payment includes , but is not limited to furnishing all labor, <br /> materials , tools and equipment , spreading , and stacking . <br /> KK . Item 7 . 03 - Selectively clear and grub (per Section 02050 ) the Edward Berndt <br /> property immediately west of the proposed stormwater detention site , including <br /> permits , demolition , disposal , etc . : <br /> 1 . Measurement and Payment : The lump sum payment will be full compensation <br /> for selective clearing and grubbing , including but not limited to , all labor, <br /> ' materials and equipment , stumping , obtain required permits , permit fees , <br /> removal of existing pipe , and disposal of debris . <br /> + + END OF SECTION + + <br /> Last revised 3/31 /03 01025- 10 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormvater Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> ' 1 \01025 - Measurement and Paynent.doc <br />