Laserfiche WebLink
SECTION 01210 <br /> ' PRECONSTRUCTION CONFERENCE <br /> 1 . 1 SCOPE <br /> A . Date , Time and Location : The Conference will be held after execution of the <br /> ' Agreement and before construction is started at the site . ENGINEER will fix <br /> the date , time and location of the meeting in accordance with the General <br /> Conditions . <br /> ' Be ENGINEER shall prepare agenda , preside at meeting , and prepare and <br /> distribute a transcript of proceedings to all parties . <br /> ' C . CONTRACTOR shall provide data required , contribute appropriate items for <br /> discussion , and be prepared to discuss all items on agenda . <br /> f1 . 2 REQUIRED ATTENDANCE <br /> A. CONTRACTOR and major Subcontractors . <br /> Be OWNER's representative . <br /> ' C . ENGINEER . <br /> ' D . Representatives of governmental agencies having any degree of control or <br /> responsibility, if available . <br /> 1 . 3 AGENDA <br /> A . Agenda will include , but will not necessarily be limited to , the following : <br /> ' 1 . Designation of responsible personnel . <br /> 2 . Subcontractors . <br /> 3 . Coordination with other contractors . <br /> ' 4 . Progress schedule . <br /> 5 . Processing of Shop Drawings . <br /> 6 . Schedule of Shop Drawing submittals . <br /> 7 . Processing of Field Orders and Change Orders . <br /> 8 . Requirements for copies of Contract Documents , <br /> 9 . Insurance in force . <br /> ' 10 . Schedule of values . <br /> 11 . Processing of progress payments . <br /> 12 . Use of premises . <br /> ' Last revised 5/29/02 01210- 1 EAST GIFFORD <br /> RIPublic Works\Keithmstorrnmeter Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> 1 \01210 - Preconstruction Conierence.doc <br />