My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1 . 5 CONTRACTOR'S S RESPONSIBILITIES FOR SUBMITTAL OF SHOP <br /> DRAWINGS , PRODUCT DATA AND SAMPLES <br /> ' A . The CONTRACTOR' s CTOR s responsibilities for submittal of shop drawings , <br /> product data , and samples are set forth in paragraph 6 . 17 of the General <br /> Conditions and further explained herein . <br /> A . Prior to submission , thoroughly check shop drawings , product data , and <br /> samples for completeness and for compliance with the Contract <br /> Documents , verify all dimensions and field conditions , and coordinate the <br /> shop drawings with the requirements for other related work . Also review <br /> each shop drawing before submitting it to the ENGINEER to determine <br /> that it is acceptable in terms of the means , methods , techniques , <br /> sequences and operations of construction , safety precautions and <br /> programs incidental thereto , all of which are the CONTRACTOR's <br /> responsibility . <br /> 1 . It is CONTRACTOR'S responsibility to review submittals made by <br /> his suppliers and Subcontractors before transmitting them to <br /> ENGINEER to assure proper coordination of the Work and to <br /> determine that each submittal is in accordance with its desires and <br /> that there is sufficient information about materials and equipment <br /> for ENGINEER to determine compliance with the Contract <br /> Documents . <br /> 2 . Incomplete or inadequate submittals will be returned for revision <br /> without review. <br /> B . The CONTRACTOR's responsibility for errors and omissions in submittals <br /> Is not relieved by the ENGINEER's review of submittals . The <br /> CONTRACTOR shall approve the shop drawings based on his in -the-field <br /> measurements , prior to submittal to the ENGINEER for his review. <br /> C . Notify the ENGINEER , in writing at the time of submission , of deviations in <br /> submittals from the requirements of the Contract Documents . The <br /> CONTRACTOR's responsibility for deviations in submittals from the <br /> requirements of the Contract Documents is not relieved by the <br /> ENGINEER's review of submittals , unless the ENGINEER gives written <br /> acceptance of specific deviations . <br /> ' D . Begin no work , which requires submittals until return of submittals with the <br /> ENGINEER's stamp and initials or signature indicating the submittal has <br /> ' been reviewed . <br /> 1 . 6 SUBMITTAL REQUIREMENTS AND ENGINEER ' S REVIEW FOR SHOP <br /> Last revised 7/17/01 01340-2 <br /> EAST GIFFORD <br /> FAPublic Works\KeithM\Stormwater Projects\Gfford East\Construction contracnechnical Specifications\Final Specifications\Division <br /> 1 \01340 - Submittal of Shop Drawings , Product Data , and Samples.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.