My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 6 PROTECTION OF PRIVATE PROPERTY <br /> ' A . Assume full responsibility for the preservation of all private property on or adjacent <br /> to the site and work area . If any direct or indirect damage is done by or on account <br /> ' of any act , omission , neglect or misconduct in the execution of the Work by the <br /> CONTRACTOR , it shall be restored by the CONTRACTOR , at its expense , to a <br /> condition equal to or better than that existing before the damage was done . This <br /> restoration includes but is not limited to , sprinkler systems , lawns and landscaping , <br /> lighting , driveways , etc . installed by private individuals or entities within public right- <br /> of-way. <br /> 1 . 7 PROTECTION OF THE WORK FROM STORMWATER RUNOFF <br /> A . Protect the Work from damage caused by stormwater runoff from rainfall . <br /> Comply with the requirements of Section 02225 . During the course of <br /> construction , it is possible that heavy rains may occur. Clean all dirt and debris <br /> from pipes and drainage structures , and repair all flooding , washouts , and other <br /> erosion damage to the Work caused by stormwater runoff, regardless of the <br /> state of completion of the Work , and until the Work is accepted by the OWNER , <br /> at no cost to the OWNER . <br /> 1 . 8 PAYMENT <br /> A . There shall be no separate payment for the work under this Section . <br /> + + END OF SECTION + + <br /> i <br /> 1 <br /> 1 <br /> 1 <br /> Last revised 12/31 /02 01541 -6 EAST GIFFORD <br /> F:\Public WorksWeithM\Stormvater Projects\Gifford East\Construction Contract\Technical Specifications\Final Specifications\Division <br /> ' 1 \01541 - Protection of the Work and Propert)Ooc <br />
The URL can be used to link to this page
Your browser does not support the video tag.