My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' B . Provide illumination of critical traffic and parking areas . <br /> 1 1 . 6 PARKING CONTROL <br /> A . Control all CONTRACTOR related vehicular parking within the limits of the <br /> ' WORK to preclude interference with public traffic or parking , access by <br /> emergency vehicles , OWNER' s operations , or construction operations . Provide <br /> temporary parking facilities for the public as may be required because of <br /> ' construction or operations . <br /> B . Monitor parking of all construction and private vehicles : <br /> ' 1 . Maintain free vehicular access to and through parking areas . <br /> 2 . Prohibit parking on or adjacent to access roads , or in non -designated areas . <br /> ' 1 . 7 SIDEWALKS AND STORMWATER SYSTEMS <br /> A . Provide access for foot passengers , either by bridging or otherwise , and do not <br /> ' obstruct the sidewalks , gutters nor prevent in any manner the flow of water in the <br /> latter. Use all proper and necessary means to permit the free passage of <br /> surface water along the gutters . Immediately cart away all offensive matter, <br /> ' exercising such precautions as may be directed by the ENGINEER or OWNER . <br /> All material excavated shall be so disposed of as to not inconvenience the public <br /> and adjacent tenants . <br /> ' 1 . 8 HAUL ROUTE FOR EXCESS SUITABLE MATERIAL AND EXCESS TOPSOIL <br /> ' A . Excess suitable material and excess topsoil from the jobsite shall be stockpiled <br /> at the Indian River County Road and Bridge Complex , located at 4550 41st <br /> Street. Before commencing work on the Project, contact the Indian River County <br /> Road and Bridge Division at 770-5085 to coordinate the placement of the <br /> material . The haul route for transporting excess suitable material from the <br /> jobsite to the stockpile area is 41 st Street . (See also Section 02220 . ) Confine <br /> ' construction traffic to designated haul routes. <br /> 1 . 9 RESPONSIBILITIES WHEN HAULING FILL MATERIAL EXCESS MATERIAL <br /> ' OR DEBRIS <br /> A . Provide traffic control at critical areas of haul routes to expedite traffic flow and <br /> to minimize interference with the normal public traffic . <br /> B . Cleanup any spillage of dirt , mud , or other material along all roads . Immediately <br /> cleanup all spillage that creates a safety problem . Cleanup all other spillage within <br /> a reasonable time or as directed by OWNER . When hauling dirt or debris over <br /> ' Last revised 5/30/02 01543-3 EAST GIFFORD <br /> F:\Public Works\KeithM\Stormweter Projects\Gifford East\Construction Contract\Technical Specifications\Fnal Specifications\Division <br /> ' 1 \01543 - Maintenance & Protection ofTraffic.doc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.