Laserfiche WebLink
SECTION 01610 <br /> ' TRANSPORTATION AND HANDLING OF MATERIALS AND EQUIPMENT <br /> 1 . 1 GENERAL <br /> A . Make all arrangements for transportation , delivery and handling of equipment <br /> and materials required for prosecution and completion of the Work . <br /> ' B . Shipments of materials to CONTRACTOR or Subcontractors shall be delivered <br /> to the site only during regular working hours . Shipments shall be addressed <br /> and consigned to the proper party giving name of Project , street number and <br /> ' city . Shipments shall not be delivered to OWNER except where otherwise <br /> directed . <br /> C . If necessary to move stored materials and equipment during construction , <br /> CONTRACTOR shall move or cause to be moved materials and equipment <br /> without any additional compensation . <br /> 1 . 2 DELIVERY , <br /> ' A . Arrange deliveries of products in accord with construction schedules and in <br /> ample time to facilitate inspection prior to installation . <br /> ' B . Coordinate deliveries to avoid conflict with Work and conditions at site and to <br /> accommodate the following : <br /> ' 1 . Work of other contractors , or OWNER . <br /> 2 . Limitations of storage space . <br /> 3 . Availability of equipment and personnel for handling products . <br /> ' 4 . OWNER' S use of premises . <br /> C . Do not have products delivered to project site until related Shop Drawings have <br /> been approved by the ENGINEER . <br /> D . Do not have products delivered to site until required storage facilities have been <br /> ' provided . <br /> E . Have products delivered to site in manufacturer's original , unopened , labeled <br /> ' containers . Keep ENGINEER informed of delivery of all equipment to be <br /> incorporated in the Work . <br /> Last revised 7/17/01 01610- 1 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormwater Projects\Gifford East\Construction Contract\Technical Specifications\Division 1 \01610 - <br /> Materials & Equipment.doc <br />