My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-118A.2
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-118A.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 4:59:13 PM
Creation date
9/30/2015 6:32:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/20/2003
Control Number
2003-118A.2
Agenda Item Number
7.F.
Entity Name
East Gifford Stormwater Improvements
Subject
Volume 2 Specifications and contract documents
Archived Roll/Disk#
3161
Supplemental fields
SmeadsoftID
3252
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' SECTION 01710 <br /> ' SITE CLEANUP AND RESTORATION <br /> 1 . 1 SCOPE <br /> ' A . Furnish all labor, equipment, appliances , and materials required or necessary <br /> to clean up and restore the site after the construction is completed . <br /> ' 1 . 2 REQUIREMENTS <br /> ' A . During the progress of the project , keep the work and the adjacent areas <br /> affected thereby in a neat and orderly condition . Remove all rubbish , surplus <br /> materials , and unused construction equipment. Repair all damage so that <br /> 1 the public and property owners will be inconvenienced as little as possible . <br /> Be Provide onsite containers for the collection of waste materials , debris , and <br /> ' rubbish and empty such containers in a legal manner when they become full . <br /> C . Where material or debris has been deposited in watercourses , ditches , <br /> gutters , drains , or catch- basins as a result of the CONTRACTOR'S <br /> operations , such material or debris shall be entirely removed and <br /> satisfactorily disposed of during the progress of the work , and the ditches , <br /> ' channels , drains , etc . , shall be kept clean and open at all times . <br /> D . Before the completion of the project , unless otherwise especially directed or <br /> permitted in writing : <br /> 1 . Tear down and remove all temporary buildings and structures ; <br /> 2 . Remove all temporary works , tools , and machinery , or other <br /> construction equipment furnished ; <br /> 3 . Remove all rubbish from any grounds occupied ; and <br /> 4 . Leave the roads , all parts of the premises , and all property affected by <br /> construction operations , in a neat and satisfactory condition . <br /> ' E . Restore or replace any public or private property damaged by construction <br /> work, equipment, or employees , to a condition at least equal to that existing <br /> immediately priorto the beginning of the operations . (This includes but is not <br /> ' limited to , items such as sprinkler systems , lawns and landscaping , lighting , <br /> driveways , etc. installed by individuals or entities within public right-of-way . ) <br /> Restore all private property and all highway, roadside , and landscaping work <br /> ' within any right-of-way, platted or prescriptive . Acceptable materials , <br /> equipment, and methods shall be used for such restoration . Reinstall all <br /> mailboxes removed during construction to the required height per the U . S . <br /> ' Last revised 7/10/02 01710- 1 EAST GIFFORD <br /> FAPublic Works\KeithM\Stormveter Projects\Afford East\Construction Contract\Technical Specifications\Rnal Specifications\Division <br /> ' 1 \01710 - Site Cleanup & Restoration .doc <br />