Laserfiche WebLink
' 12 . All test certificates and/or affidavits requested by the ENGINEER . <br /> 13 . Section 00632 — Contractor' s Final Certification of the Work . <br /> ' 14 . Section 00634 - Professional Surveyor and Mapper' s Certification as to <br /> Elevations of the Work . <br /> 15 . All other items required by these Contract Documents . <br /> ' 1 . 3 FINAL CLEANING <br /> ' A . General : As specified herein and in Section 01710 , provide final cleaning of the <br /> Work . <br /> ' B . Clean project site , including landscaping and development areas , of litter and <br /> foreign substances . Sweep paved areas to a broom-clean condition ; remove <br /> stains , petrochemical spills and other foreign deposits . Rake grounds which <br /> ' are neither planted nor paved , to a smooth even -textured surface . <br /> 1 . 4 REMOVAL OF PROTECTION <br /> ' A . Except as otherwise indicated or requested by the OWNER , remove temporary <br /> protection devices and facilities which were installed during the course of the <br /> work to protect previously completed work during the remainder of the <br /> construction period . <br /> ' 1 . 5 COMPLIANCY <br /> A . Comply with safety standards and governing regulations for cleaning <br /> ' operations . Do not burn waste materials at the site , or bury debris or excess <br /> materials on the OWNER's property , or discharge volatile or other harmful or <br /> 1 dangerous materials into drainage systems ; remove waste materials from the <br /> site and dispose of in a lawful manner. <br /> B . Where extra materials of value remaining after completion of the associated <br /> work have become the OWNER's property , dispose or store at the site as <br /> directed by the OWNER . <br /> + + END OF SECTION + + <br /> ' Last revised 7/17/01 01810-2 EAST GIFFORD <br /> FAPublic WorksWeithM\Stormwater Projects\Gifford East\Construction Contract\Technical Specifications\Division 1 \01810 - Project <br /> ' Closeout.doc <br />